My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1984-10-17 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1984
>
1984-10-17 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:59 PM
Creation date
7/31/2025 10:39:46 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/17/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />• <br />CHANGE ORDER <br />Dated ,August. 28, .1984 <br />;~o. ...4..... <br />OR'NER's Project No . ....................... ENGINEER'S Project No. , , , 171.1. 84 ... _ . _ _ ... <br />Street Paving and Drainage Improvements <br />Project .................. ......................... <br />CONTRACTOR .McKey Construction .and .Equipment,. Inc.. _ .. ... .. .. . _ ....... _ . . <br />Contract For , ,$411 ,107.. 00. .. . , , , , , , , , Contract Date , ,July 20, 1984 .. ......... . <br />To: , ,McKey Construction and, Equipment ~ .Inc. , <br />.... ............... . . .... ... <br />CONTRACTOR <br />You are directed to maize the changes noted below in the subject Contract: <br />• ~ .. 1. Y. of La Porte ................... <br />OWNER <br />I <br />Datedi . L•~'ll.. .,...~.~....... , 19. 1~~. . <br />Aature of the Changes Lower 400 Linear feet of existing water line and back fill over top <br />with cement stabilized sand up to bottom of proposed subgrade on (East) <br />North "P" street from station 3+00 to 5+00 and 7+00 to 9+00 at a unit price <br />df $7.00 per linear foot; each water service at a unit price of $100.00 <br />each. Cement stabilized sand at $20.00 per ton. <br />Enclosures: <br />These c)~anges result iri rile following adjustment of Contract Price and Contract Time: <br />Contract Price Prior to This Change Order <br />.'y'et (Increase) (%1~~) Resulting from this Charge Order <br />Cuncnt Cuntract Price ]ncluding This Change Order <br />~ „$418,112.,00.•.•..._„ <br />S $ 3,900.00•....•.•.. <br />~ ..$422,012.00..._• ._ <br />\S}'E•ACEC 1910.8-B (1975 Edition) <br />
The URL can be used to link to this page
Your browser does not support the video tag.