Laserfiche WebLink
• <br />r� <br />L <br />INTER -OFFICE MEMORANDUM <br />JANUARY 31, 1985 <br />TO: Luther Maxey - Assistant Director of Public Works <br />FROM: J. Ray - Purchasing A nt <br />SUBJECT: Sealed Bid #0067 <br />Advertised, sealed b r#0067 for the purchase and installation of two <br />auxiliary diesel engines at Water Wells #1A an were opene an rea in <br />City Counci am ers anuary at p.m. id invitations were mailed <br />to eleven area contractors with the following five returning bids: (1) M.S. <br />Beck Co., (2) I.C.S., (3) Stewart and Stevenson Services Inc., (4) Sepco, Inc. <br />and (5) Demar Engineering. <br />These engines will replace two LeRoi natural gas engines that are around <br />twenty years old and have been deemed uneconomical to repair. Both auxiliary <br />power units will be required to provide electrical power to Water Wells #1A <br />and #3 in the event of a power outage, enabling City water crews to maintain <br />pressure in the Water distribution system in emergency periods. <br />Low bid was submitted by Demar Engineering Inc. in the amount of $34,122.00, <br />a completion time of seventy days, and a warranty of one year. Although Demar <br />Engineering has submitted engines which basically meet City of La Porte speci- <br />fications, they did not supply the required references for work done in this field. <br />The low bid submitted by Demar Engineering was rejected for lack of experience <br />and specificity. <br />Low bid meeting specifications was submitted by Sepco Industries Inc. of <br />Houston, Texas. Total bid price submitted was $38,845.00, a completion time of <br />one -hundred days and a warranty of one year. Sepco Industries has been actively <br />involved in the pump and power distribution business for over seventy-six years <br />and has provided the requisite references and bonding requirements. <br />A total of fifty -thousand dollars is presently appropriated in the 1984-85 <br />Water/Wastewater Capital Improvement Fund for the completion of this project. <br />I recommend that the City of La Porte award turnkey installation of auxiliary <br />diesel engines at Water Wells #1A and #3 to Sepco Industries in the amount of <br />$38,845.00 and a completion time of 100 days. I trust this recommendation will <br />meet with your approval. <br />JR/mb <br />cc: J. Hodge, B. Herrera <br />Attachment: Tabulation #0067 <br />