My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1985-04-17 Public Hearing and Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1985
>
1985-04-17 Public Hearing and Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:59 PM
Creation date
7/31/2025 10:40:06 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
4/17/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• .: <br />r- -'~ <br /> <br />III. COh1MENTARY <br />Presented as attachments are program descriptions for-each of <br />the areas addressed in the recommendations. The comments given in <br />this section are general for these areas, and are not meant to be <br />all-inclusive. The Committee and/or City Staff stand ready to more <br />fully amplify on any of these, should such amplification be <br />desired. Additional information is also attached to this report, <br />or appears in the final issue of the Comprehensive Plan, Volume I. <br />REVENUE BONDS <br />The $8.7 million revenue bond issue for utilities would fund <br />the much-needed Fairmont Parkway interceptor to relieve sewage <br />'load in this area, provide for a 12 inch main along Spencer <br />connecting the main plant with the College View system, and <br />provide for expansion of the main treatment plant. Additionally, <br />similarly needed sewer relief projects in East La Porte and in the <br />Bayshore area would be accomplished. Also, an elevated water <br />storage facility to serve College View and adjacent areas would be <br />constructed. The need for these projects is deemed critical. The <br />Fairmont Parkway line was undersized as soon as the treatment <br />plant in that area was dismantled. Raw sewage was observed coming <br />out of a man-hole during a heavy rain at this site after <br />dismantling of the old plant. Connection with the College View <br />system is needed to treat waste in the La Porte plant. Expansion <br />of the treatment plant is critical, as the City has been placed <br />unde r a compliance schedule by the Texas Department of Water <br />- 9 - <br />1 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.