Laserfiche WebLink
<br />., <br /> <br />I, <br /> <br />. . <br /> <br />Fede:al Emergency Manage~ent Agency <br /> <br /> <br />Region VI <br /> <br />Federal Center <br /> <br />Denton, Texas 76201 <br /> <br />May 3, 1983 <br /> <br />Honorable Virginia Cline <br />Mayor, City of La Porte <br />P. O. Box 1115 <br />La Porte, Texas 77571 <br /> <br />Dear Mayor Cline: <br /> <br />I want to thank you for the cooperation and courtesy shown to <br />Mr. Carl McChesney on his recent visit to review the City's flood- <br />plain management program. Please express my thanks also to Mr. John <br />Joerns, graduate Engineer and Mr. David Paulissen, Building Official. <br />They were knowledgeable and interested in achieving good floodplain <br />management. <br /> <br />Although we found your program to be adequate, two serious deficiencies <br />were found which warrant your attention. <br /> <br />1. The revised Flood Insurance Stuc:!.Y__PJ:,~UJ'!!.i.Dar.Y..J!@.p~2-<;ontaininCJ wa_y~ <br />h~iCJht-aata, were presented t9~e City__~~ewb.er 11. 1~8Z~ <br />Although the City has challenged the accuracy of the maps in some <br />flood prone areas and requested several changes in the maps, includ- <br />ing additional map panels, the ma~~~q_~Qotain the latest and best <br />fJoodpl a in i nformat iOJLlli i 1 alll~ and sho_l!l..<U>JLilLcJ.u:Y'ent us.Lt..Q-sy.Lde <br />deve 1 opments. especi ally thQ.S-.-e~LlQ,cat(\d wit.b..iILdesi.g~'LelQj;jJY_ <br />Zones. Since your current ordinance does not contain development stand- <br />ards for Velocity Zone construction, we strongly recommend the immediate <br />adoption of appropriate amendments. We are enclosing a copy of our <br />recommended model ordinance for your consideration and use. <br /> <br />2. A field review of the city's flood hazard areas resulted in locating <br />construction of solid, non-breakaway walls within a Velocity Zone. <br />A small portion of the Woods-on-the-Bay development and a single <br />family residence located at the east end of Bay Harbor Street are <br />located in velocity zones. Adoption of the above referenced Velocity <br />Zone standards can prevent this type of high risk construction in the <br />future. <br /> <br />We were pleased to hear that the city has established an excellent ground <br />control survey system which can be readily used,for floodplain management <br />purposes and which can be updated in the future to correct elevations to <br />compensate for anticipated subsidence within the community. We also dis- <br />cussed the possibility of the city adopting an overall storm-water manage- <br />ment program incorporating development standards and criteria more compre- <br />hensive than FE~~'s standards. <br /> <br />-, <br />