My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1985-10-28 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1985
>
1985-10-28 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:00 PM
Creation date
7/31/2025 10:40:41 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/28/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • <br />Page Two <br />October 15, 1985 <br />RE: CLP ~~84-7109 <br />Special condition 50 of the contract with McKey allows the City to <br />add up to 10~ of the contract amount for 12" gravity sewers <br />($1255.32) at the bid unit prices. If the extra work exceeds that <br />amount, a lump sum price is to be mutually agreed upon by the City <br />and the contractor. If agreement cannot be reached, the work is <br />to be performed at cost plus 15%. <br />McKey has offered to do all the work for the <br />except for Bid Item 3, for which he wants an <br />foot in order to recover a cost increase in <br />taken place since the contract was awarded. <br />an additional $295.50 over the contract unit <br />change order of $13,309.00. <br />A project financial summary follows: <br />contract unit prices, <br />extra $.30 per lineal <br />materials that has <br />This would result in <br />prices, for a total <br />Original Authorization $165.000.00 <br />Expenditures to Date <br />Engineering Services $ 25140.45 <br />Misc. Survey <br />AppraisalLLand Acq. ~ 2,,030.00 <br />Construction Contract $ 90,723.17 <br />Balance $ 47,106.38 <br />BS/tla <br />Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.