Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />TurnerCollie0Braden lnc. <br /> <br />ALAN R. lEFTS <br />PROIECT DIRECTOR <br /> <br />PO BOX 13089 <br />HOUSTON, TEXAS 77219 <br />5757 WOODWAV <br />713 780-4100 <br />TELEX 774185 TeB I-IOU <br /> <br />July 17, 1986 <br /> <br />City of La Porte <br />P. O. Box 1115 <br />La Porte, Texas 77571 <br /> <br />Attention: Mr. Steve Gillett <br />Acting Director of Public Works <br /> <br />Re: Change Order No. 1 <br />Contractor: Brown & Root, U.S.A., Inc. <br />Contract Date: April 21, 1986; Amended May 21, 1986 <br />Contract Amount: $902,835.10 <br />TC&B Job No. 26-00031-020, Contract No.2 <br />Airfield Improvements for City of La Porte <br />Municipal Airport <br />AlP No. 3-48-0127-03/04 85 <br /> <br />Gentlemen: <br /> <br />In accordance with your written direction of July 2, 1986, and per <br />your acceptance of Brown and Rootls letter proposal of May 30, 1986 <br />(copies of which are attached hereto), preparation of this Change <br />Order is for the purpose of adding additional quantities to existing <br />proposal items under Alternate Bid No.2. The additional quantities, <br />as described below, are to accommodate extra work associated with <br />the T-Hangar Area. <br /> <br />Alternate Bid No. 2 <br /> <br />Item 1 - Unclassified Excavation, Complete. <br /> <br />Add three hundred twenty six (326.0) cubic yards of unclassified <br />excavation to the existing contract quantity of two thousand five <br />hundred (2,500.0) cubic yards for a total revised contract quantity <br />of two thousand eight hundred and twenty six (2,826.0) cubic yards. <br />The additional quantities will result in an increase to the contract <br />amount as follows: <br /> <br />326 C.Y. @ $5.00 per C.Y. = $1,630.00 <br /> <br />Item 3 - Embankment in Place, Compl~te. <br /> <br />Add one thousand three hundred and sixty (1,360.0) cubic yards <br />of embankment to the existing contract quantity of one hundred and <br />twenty (120.0) cubic yards for a revised contract quantity of one <br />thousand four hundred and eighty (1,480.0) cubic yards. The addi- <br />tional quantities will result in an increase to the contract amount <br />as follows: <br /> <br />CON~I It nlttJr'.. r.:~r:IIttrJr:r.DC: _ TrVar .... .. I......... _. <br />