My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1987-07-02 Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1987
>
1987-07-02 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:00 PM
Creation date
7/31/2025 10:41:09 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/2/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • <br />GENERAL PROVISIONS: <br />Attached to anal made a part of LETTER AGREEMEiJT dated Se~~ternhFr <br />2c3, 19Ii7, between City of La Pcrt,c, 'T'exas (OwnE;yr) ar,d IT. Cr~rl~-~s <br />Smith, Engineers R~~>urvcyors, Inc., (Fn~ineer) in re~;pect of the <br />pro je~^t (Project) descr. ibed tli~r. ei.n , <br />SECTION I -BASIC SERVICES OF ENGINEER <br />1.1 GENERAL <br />1.1.1. ENGINEER shall perform p.rofes~,ic>nal services cis <br />hereinafter stated which include c~.astomary civil, truct~_~ral, <br />mechanical and electrical engineering services and customary <br />arcriitectural services incidental thereto. <br />1.2. PRELIMINARY ENGINEERING PHASE <br />After written a~.~thori?ation to proc:eecT with the P.rc.li.rnina.ry <br />Design Phase, EN~;TNEER 5ha11: <br />1.2.1. In consultation with OWNER determine the ext.c-nt of the <br />Project. <br />1.2.?. Prepare preliminary design eloc~.iments consist.in~~ of f:i_nal <br />design criteria, preliminary drawings and o~.itline spec.if ic,~tti.ons . <br />1.2.3. E~a~.ed on the i.nforma.tion contained. iri tree preliminary <br />design docl.zments, submit a r.•cvi.srd opinion of probahle Pr. c,jt~;ct. <br />Cast. <br />1.2.4 , F~t.rni:~ra f i.ft.?en copies of the above preliminary design <br />documents aTld present and review them in person with tl~~c OWNER. <br />The duties and responsibilities of ENGINEER during the <br />Preliminax•y Engineering Phase are amended and supplemented as <br />indicated in the Scope of services. <br />1. 3. DESIGN PHASE <br />After written authorisatior~ to proceed with the Design Phase <br />ENGINEER shc-~.l.l: <br />1.3.:1. Or, the basis of t.hF, acc;epted preliminary d.e~;ign documents <br />prepare for i.ncc~x•porati.on ir, the Contract DocumE nts , final.. <br />drawings t.o show trig ch,=~racte r ;:ind Ccope of the work t.o hey <br />performf~d by C;<,-,.~ltra.ctors or.~~ thc~ Pz•ajf•ct (riereinr~f.t.er c<~.11~d <br />"I)-rawin~;s") , arid. Sp,~ci.fic:.atior~.:1, <br />;Page 3 of 1.7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.