My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1987-07-13 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1987
>
1987-07-13 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:00 PM
Creation date
7/31/2025 10:41:11 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/13/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ESPEY, <br />' HUSTON & <br />ASSOCIATES, INC. <br />''"- Engineering & Environmental Consultants <br />June 18, 1987 <br />M r. Pat O' M ally <br />Contract Administrator <br />City of La Porte <br />604 West Fairmont Parkway <br />La Porte, Texas 77571 <br />RE: Municipal Golf Course <br />Irrigation Supply & Pedestrian/Cazt Tunnel <br />Bid Report <br />Gentlemen: <br />EH&A Job No. 10078-05 <br />Bids for the above referenced projects, as covered by the Contract Drawings and <br />Specifications prepazed by Espey, Huston & Associates, Inc. were received until 4:00 <br />p.m. on June 15, 1987 by the office of the City Secretazy. Shortly thereafter, all <br />bids received were opened and the total price bid read aloud for each of the two <br />proj ects. <br />Six (6) bids were received for the Effluent Irrigation Supply System. The bids were <br />as follows: <br />BIDDE R <br />TOTAL BASE BID ADJUSTED BASE BID <br />Allgood C oristruction $ 66, 753.01 $ 64, 353.01 <br />Mercer Construction 82,418.00 73, 618.00 <br />M cKey C onstruction 86, 430.00 72, 730.00 <br />Weisinger W ater W ell 115, 950.00 110, 350.00 <br />Texas U tilities Coast. 122, 520.00 112, 520.00 <br />Craig, Sheffield & Austin 153, 065.00 145, 065.00 <br />The Engineer's Estimate of construction cost is $61,000. All bid proposals receeved <br />generally adhered to the provisions of the Contract Documents. <br />Six (6) bids were received for the Golf Cart/Pedestrian Tunnel. The bids were as <br />follows: <br />BIDDE R <br />Allgood Construction <br />M ercer C onstruction <br />TOTAL B ASE BID <br />$ 120,188.39 <br />130,513.00 <br />ADJ USTE D B ASE BID <br />$ 104, 022.3 9 <br />129, 433.00 <br />888 West Belt Dr. South, Suite 200 Houston, Texas 77042 (713) 781-8800 <br />
The URL can be used to link to this page
Your browser does not support the video tag.