My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1987-07-27 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1987
>
1987-07-27 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:00 PM
Creation date
7/31/2025 10:41:13 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/27/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />r---_ <br /> <br />1.3.2. Furnish to OWNER such documents and design data as may be <br />required for, and assist in the preparation of the required <br />documents so the OWNER may apply for approvals of such . <br />governmental authorities as have jurisdiction over design <br />criteria applicable to the Project, and assist in obtaining such <br />approvals by participating in submissions to and negotiations <br />with appropriate authorities. <br /> <br />1.3.3. Advise OWNER of any adjustments to the latest opinion of <br />probable Project Cost caused by changes in extent or design <br />requirements of the Project or Construction Cost and furnish a <br />revised opinion of probable Project Cost based on the Drawings <br />and Specifications. <br /> <br />1.3.4. Prepare for review and approval by OWNER, his legal <br />counsel and other advisors contract agreement forms, general <br />conditions and supplementary conditions, and (where appropriate) <br />bid forms, invitati6ns to bid and instructions to bidders, and <br />assist in the preparation of other related documents. <br /> <br />1.3.5. Furnish five copies of the above documents and present <br />and review them in person with OWNER. The duties and <br />responsibilities of ENGINEER during the Design Phase are amended <br />and supplemented as indicated in the Scope of Services. <br /> <br />SECTION II - SPECIAL SERVICES OF ENGINEER <br /> <br />2.1. Normal and customary engineering services do not include <br />services in respect of the following categories of work which are <br />usually referred to 85 Additional or Special Services. If OWNER <br />wishes ENGINEER to perform any Special Services, he shall 50 <br />instruct ENGINEER in writing, and ENGINEER will be paid therefor <br />as provided in the Letter of Agreement. <br /> <br />SECTION III - OWNER'S RESPONSIBILITIES <br /> <br />3.1. OWNER shall provide all criteria and full information as to <br />OWNER's requirements for the Project; designate a person to act <br />with authority on OWNER's behalf in respect of all aspects of the <br />project; examine and respond promptly to ENGINEER's submissions; <br />and give prompt written notice to ENGINEER whenever he observes <br />or otherwise becomes aware of any defect in the work. <br /> <br />"~'I <br />, <br />, <br /> <br />Page 10 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.