My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1987-07-27 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1987
>
1987-07-27 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:00 PM
Creation date
7/31/2025 10:41:13 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/27/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />III"""': <br /> <br />. - <br /> <br />. .' '. <br /> <br />PHONE 471.2103 <br />111 NORTH 16TH STREET P. O. Box 9 <br />LA PORTE. TEXAS 77571 <br /> <br /> <br />SITE WORK . UNDERGROUND UTILITIES <br /> <br /> <br />McKey Construction & Equipmen~ Inc. <br />"71e EMd ?Ituu .- 1Ue ~ ~" <br /> <br />July 17, 1987 <br /> <br />'I\n:ner Collie & Braden, Inc <br />5757 Woodway <br />Hous ton, Texas <br /> <br />RE: Fainoont Parkway Relief <br />Sanitary Sewer. <br />Item 41: Rehabilitate existing <br />pump station- <br />College View Sewage treatment plant <br /> <br />Attention: Bruce Baumell <br /> <br />II <br />Per your request telephone conversation 7/17/87. <br />Please find listed below prices for material and labor for installing new piping <br />at College VifM lift station." <br /> <br />Material: <br /> <br />1 each 12 X 8 tee <br />1 each 12 X 10 X 8 tee <br />1 each 10 X 8 tee <br />1 each 10 X 8 reducer <br />1 each 8-inch 90 degree bend <br />1 each 10-inch by 23-inch F to F steel pipe <br />1 each 8-inch by 28-inch F to F steel pipe <br />3 each 8-inch by 9 foot 2-inch F to F steel pipe <br />All nfM Cadmium. bolt and red rubber gaskets. <br /> <br />Material only <br /> <br />$ 2,713.14 <br /> <br />Labor Price: <br /> <br />Extra t:i.ne scaffoling rental <br />Extra t:i.ne by pass pump rental <br />Torch cutting of all existing bolts <br />Extra t:i.ne getting all existing piping out of well <br />Extra t:i.ne bolting up nfM piping <br />Fab of all nfM steel fittings. <br />:1 labor and Fab <br /> <br />MaterialOnly $ 2,7l3.l4 <br />labor and Fab $ 5,242~63 <br />TOTAL $ 7,955.77 <br /> <br />Deduct for work figured in original bid for cleaning existing fittings and <br />pipe. $ 1,100.00 <br /> <br />TOTAL $ 6,855.77 <br /> <br />$ 5,242.63 <br /> <br />page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.