My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1987-08-24 Public Hearings and Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1987
>
1987-08-24 Public Hearings and Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:00 PM
Creation date
7/31/2025 10:41:19 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
8/24/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />rOM, BS thru JA to RTH, RE: Lomax CIP Drainage Improvements, Page 3 <br /> <br />. <br /> <br />Alternatives I and II were the other approaches studied. Alternative <br />I is a straight-forward solution involving the enlargement of several <br />eXisting Flood Control open channels in Lomax, the construction of <br />four north-south lateral channels, and associated structural <br />improvements at roads, highways, and railroads. Alternative II <br />examines the possibility of constructing a 70-acre detention pond west <br />of Strang Yard to reduce the cost of improvements under and east of <br />Strang Yard. Alternatives I and II can be compared purely on a cost <br />basis. The table below shows that comparison: <br /> <br /> ALTERNATIVE I ALTERNATIVE II <br /> (Million $) (Million $) <br /> Galveston Bay to Strang Yard 1.364 1 .064 <br /> Strang Yard to EXXON Pipel. Corr. 1 .424 1 .052 <br /> West of EXXON Pipel. Corr. 1.384 1.362 <br /> Detention Facility and Weir None 2.145 <br /> ----- ----- <br /> TOTAL CONSTRUCTION COST 4.172 5.623 <br /> Pipeline Adjustments 0.400 0.400 <br /> Utility Adjustments 0.050 0.050 <br /> Channel Right of Way 1. 136 1.060 <br /> Detention Pond Site None 1.050 <br /> ----- ----- <br />. TOTAL NON-CONSTRUCTION COST 1 .586 2.560 <br /> ----- ----- <br />TOTAL PROJECT COST 5.158 8.183 <br /> <br />Alternative II results in a $770,000 savings in channel right-of-way <br />acquisition and construction costs. However, the cost of land and <br />construction of the detention pond is estimated to cost $3,195,000. <br />Thus, Alternative II would cost about $2,425,000 more than Alternative <br />I. <br /> <br />CONCLUSIONS <br /> <br />1. Diversion of part of Lomax's runoff to Big Island Slough would <br />have substantial downstream impacts on the Slough. Accordingly, <br />Alternates III and IV are not economically feasible options. <br /> <br />2. Alternate II offers no advantage over Alternate I and costs <br />over 40% more. <br /> <br />RECOMMENDATION <br /> <br />Staff recommends that City Council accept Alternative I, as presented <br />by Flood Control, as the master drainage plan for Lomax. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.