Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />e <br /> <br />. <br /> <br />yard, Sens Road and Valley View Street. The ultimate channel will average four- <br /> <br />teen feet in depth and range in bottom wi dth from 8 to 60 feet. Several new <br /> <br />lateral channels are proposed to convey the storm runoff to the primary drainage <br />system. The construction will require the acquisition of 56.8 acres of drainage <br /> <br />right-of-way. <br /> <br />The ultimate construction and right-of-way acquisition are estimated to cost <br /> <br />$5,758,000.00. <br /> <br />The improvements consistent with this master plan required to solve the <br />existing drainage problems were estimated to cost $4,325,500.00. These impro- <br /> <br />vements include the installation of the ultimate major structures and a chan- <br /> <br />nel which averages fourteen in depth and has a bottom width which ranges from <br /> <br />8 to 40 feet. <br /> <br />19000.5-52 <br /> <br />- 3 - <br />