Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />e <br /> <br />. <br /> <br />COST ESTIMATE FOR <br />DIVERSION OF 550 ACRES <br />TABLE 6D <br /> <br />BI06-00-00 IMPROVEMENTS <br /> <br /> ITEM QUANTITY UNIT UNIT PRICE COST <br />1. Channel Excavation 1,150,000 CY $ 3.50 $ 4,025,000.00 <br />2. Concrete Slope 40,000 SY 35.00 1,400,000.00 <br /> Paving <br />3. Drop Structure 1 LS 200,000.00 <br />4. Bridge Replacement 16,900 SF 45.00 760,500.00 <br /> Total Construction Cost $ 6,385,500.00 <br />1. Utility Adjustments LS $ 271,000.00 <br />2. Pipeline Adjustments LS 500,000.00 <br />4. Right-of-Way 35 AC 15,000.00 525,000.00 <br /> Total Non-Construction Cost $ 1,296,000.00 <br /> TOTAL PROJECT COST $12,438,600.00 <br /> <br />19000.CE5 <br /> <br />- 6 - <br />