Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />e <br /> <br />COST ESTIMATE FOR <br />DIVERSION OF 1,110 ACRES <br />TABLE 6E <br />8106-00-00 IMPROVEMENTS <br /> <br /> ITEM QUANTITY UNIT UNIT PRICE COST <br />1. Channel Excavation 1,590,000 CY $ 3.50 $ 5,565,000.00 <br />2. Concrete Slope 42,000 SY 35.00 1,470,000.00 <br /> Paving <br />3. Drop Structure 1 LS 200,000.00 <br />4. Bridge Replacement 23,700 SF 45.00 1,066,500.00 <br /> Total Construction Cost $ 8,301,500.00 <br />1. Utility Adjustments LS $ 283,000.00 <br />2. Pipeline Adjustments LS 750,000.00 <br />4. Right-of-Way 47 AC 15,000.00 705,000.00 <br /> Total Non-Construction Cost $ 1,738,000.00 <br /> TOTAL PROJECT COST $14,524,800.00 <br /> <br />19000.CE7 <br /> <br />- 8 - <br />