Laserfiche WebLink
<br />e <br /> <br />2.6.4 The Architect shall be a representative of and shall ad\'ise <br />and consult with the Owner (I) during construction until final <br />payment to the Contractor is due, and (2) as an Additional Ser. <br />vice at the Owner's direction from time to time Juring the cor- <br />rection period described in the Contract for Construction, The <br />Architect shall have authonty to act on behalf of the Owner <br />only to the extent provided in this Agreement unless otherwise <br />modified by written instrument, <br /> <br />2.6.5 The Architect shall visit the site at intervals appropriate <br />to the stage of construction or as otherwise agreed by the <br />Owner and Architect in writing to become generally familiar <br />with the progress and quality of the, Work completed and to <br />determine in general if the Work is being performed in a man- <br />ner indicating that the Work when completed will be in accor- <br />dance with the Contract Documents, However, the Architect <br />shall not be required to make exhaustive or continuous on-site <br />inspections to check the quality or quantity of the Work, On <br />the basis of on.site observations as an architect, the Architect <br />shall keep the Owner informed of the progress and quality of <br />the Work, and shall endeavor to guard the Owner against <br />defects and deficiencies in the Work, (More extensil'e site <br />representatioll may be a~reed to as an Additional Ser!'ice, as <br />described in Paragraph 3,].) <br /> <br />2.6.6 The Architect shall not have control over or charge of <br />and shall not be responsible for construction means, methods, <br />techniques, sequences or procedures, or for safety precautions <br />and programs in connection with the Work, since these are <br />solely the Contractor's responsibility under the Contract for <br />Construction, The Architect shall not be responsible for the <br />Contractor's schedules or failure to carry out the Work in accor- <br />dance with the Contract Documents, The Architect shall not <br />have control o\'er or charge of acts or omissions of the Contrac- <br />tor, SubcontractOrs, or their agents or employees, or of any <br />other persons performing portions of the \,\'ork, <br /> <br />2.6.7 The Architect shall at all times have access to the Work <br />wherever it is in preparation or progress, <br /> <br />2.6.8 Except as may otherwise be provided in the Contract <br />Documents or when direct communications have been spe- <br />cially authorized, the Owner and Contractor shall communicate <br />through the Architect. Communications by and with the Archi- <br />tect's consultants shall be through the Architect. <br /> <br />2.6.9 Based on the Architect's observations and evaluations of <br />the Contractor's Applications for Payment, the Architect shall <br />review and certify the amounts due the Contractor. <br /> <br />2.6.10 The Architect's certification for payment shall consti- <br />tute a representation to the Owner, based on the Architect's <br />observations at the site as pro\'ided in Subparagraph 2,6,) and <br />on the data comprising the Contractor's Application for Pay- <br />ment, that the \X'ork has progressed to the point indicated and <br />that, to the best of the Architect's knowledge, information and <br />belief, qualit\' of the \X'ark is in accordance with the Contract <br />Documents, The foregoing representations are subject to an <br />.evaluation of the Work for conformance with the Contract <br />Documents upon Substantial Completion, to results of subse- <br />quent tests and inspections, to minor deviations from the Con- <br />tract Documents correctable prior to completion and to spe. <br />cilk qualifications expressed by the Architect. The issuance of a <br />Certificate for Payment shall further constitute a representation <br />that the Contractor is entitled to payment in the anlount certi- <br />fied, However, the issuance of a Certit1cate for P;lyment shall <br />not be a representation that the Architect has (I) maJe exhaus- <br />tive or continuous on.site inspections to check the quality or <br /> <br />e <br /> <br />quantity of the \X'ork, (2) reviewed construction means, meth- <br />ods, techniques, sequences or procedures, (:I) revleweJ copies <br />of requisitions received from Subcontractors and material sup- <br />pliers and other data requested by the Ovmer to substantiate <br />the Contractor's right to payment or (4) ascertained how or for <br />what purpose the Contractor has used mOr:ley previously paiJ <br />on Jccount of the Contract Sum, <br /> <br />2.6.11 The Architect shall have authority to reject Work which <br />does not conform to the Contract Documents, \X'hene\'er the <br />Ar:::hitect considers it necessary or advisable for implementa- <br />tion of the intent of the Contract Documents, the Architect will <br />have authority to require additional inspection or testinR of the <br />Work in accordance with the provisions of the Contract Docu- <br />ments, whether or not such Work is fabricated, installed or <br />completed, However, neither this authority of the Architect nor <br />a deCision made in good faith either to exercise or not to exer- <br />cise such authority shall give rise to a duty or responsibility of <br />the Architect to the ContractOr, Subcontractors, material anJ <br />equipment suppliers, their agents or employees or other per- <br />sons performing portions of the Work, <br /> <br />2.6.12 The Architect shall review and approve or take other <br />appropriate action upon Contractor's submittals such as Shop <br />Drawings, Product Data and Samples, but only for the limited <br />purpose of checking for conformance with information given <br />and the design concept expressed in the Contract Documents, <br />The Architect's action shall be taken with such reasonahle <br />promptness as to cause no delay in the Work or in the con- <br />struction of the Owner or of separate contractors, while allow- <br />ing sufficient time i>>xkQ{JOd:lK/IOCx~~H~~~ to <br />permit adequate review, Review of such submittals is not con. <br />ducted for the purpose of determining the accuracr and com. <br />pleteness of other details such as dimensions and quantities or <br />for substantiating instnlctions for installation or performance of <br />equipment or systems designed by the Contractor, all of which <br />remain the responsibilitr of the Contractor to the extent <br />required by the Contract Documents, The Architect's re\'iew <br />shall not constitute approval of safety precautions or, unless <br />otherwise specifically stated by the Architect, of construction <br />means, methods, techniques, sequences or procedures, The <br />Architect's approval of a specitlc item shall not indicatc <br />approval of an assembly of which the item is a component, <br />When professional certification of performance characteristics <br />of materials, systems or equipment is required by the Contract <br />Documents, the Architect shall be entitled to rely upon such <br />certifi('ation to establish that the materials, systems or equip- <br />ment will meet the performance criteria required by the Con. <br />tract Documents, <br /> <br />2.6.13 The Architect shaIJ prepare Change Orders and Con- <br />struction Change Directives, with supporting documentation <br />and data if deemed necessary by the Architect as provided in <br />Subparagraphs 3,1.\ and 3,3,3, for the Owner's approval and <br />execution in accordance with the Contract Documents, and <br />may authorize minor changes in the Work not involving an <br />adjustment in the Contract Sum or an extension of the Contract <br />Time which are RCX\l4lRCOnsistent with the intent of the Contract <br />Documents, <br /> <br />2.6.14 The Architect shall conduct inspections to determine <br />the date or dates of Substantial Completion and the d:lte of final <br />completion, shall receive and forward [0 the Owner for the <br />Owner's review anJ records written warranties and related <br />documents required by the Contract Documents and assem. <br />bled hy the ContraCtor, and shall issue a final Certificate for PJV- <br />ment upon compliance with the requirements of the Cllntract <br />Documents, <br /> <br />3 8141-1987 <br /> <br />AlA DOCUMENT 8141 . OWNER-ARCHITECT AGREEMENT' FOURTEENTH EDITION' AlA'" . !91"'H" <br />THE A~IERICAN I:"STlTL:TE OF ARCHITECT~, 1 i3S NEW YORK AVENUE, N,W" WASHINGTON, D,C. 20(W16 <br />