My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1989-07-05 Special Called Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1989
>
1989-07-05 Special Called Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:49:22 AM
Creation date
7/31/2025 10:43:27 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/5/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />• <br />E. Status of pern or proposed project <br />1. Has permi t been i ssueci? N_/ A <br />3. Status of Application N/A <br />2. Date application was filed? N / A <br />F. Estimated Cost for proposed project. <br />1. Describe basis for cost, source of cost data, and time for which estimate is valid. <br />Engineering construction cost estimate was $1,600.000 <br />This estimate is valid for approximately l year <br />2. Construction Cost <br />STP <br />I/I Rehab. N/A <br />Major Sewer Rehab. 300,000 <br />Interceptors 1, 0 5 0, 0 0 0 <br />Collection system N / A <br />Conti agency ( 2 0%) 2 7 0, 000 <br />Total Construction Cost S 1 , 620 , 000 <br />3. Engineering <br />4. Financial <br />5. Legal <br />6. Adninistration <br />7. Land <br />8. Other <br />9. Total Project Cost <br />G. Estimated Project Schedule <br />1. Date Construction should begin <br />2. Estimated Date Construction Completed <br />80,000 <br />23,875 <br />50,000 (est.) <br />See 3 above <br />N/A <br />S 1,773,875 <br />April 1990 <br />April 1991 <br />
The URL can be used to link to this page
Your browser does not support the video tag.