Laserfiche WebLink
• <br />• <br />E. Status of pern or proposed project <br />1. Has permi t been i ssueci? N_/ A <br />3. Status of Application N/A <br />2. Date application was filed? N / A <br />F. Estimated Cost for proposed project. <br />1. Describe basis for cost, source of cost data, and time for which estimate is valid. <br />Engineering construction cost estimate was $1,600.000 <br />This estimate is valid for approximately l year <br />2. Construction Cost <br />STP <br />I/I Rehab. N/A <br />Major Sewer Rehab. 300,000 <br />Interceptors 1, 0 5 0, 0 0 0 <br />Collection system N / A <br />Conti agency ( 2 0%) 2 7 0, 000 <br />Total Construction Cost S 1 , 620 , 000 <br />3. Engineering <br />4. Financial <br />5. Legal <br />6. Adninistration <br />7. Land <br />8. Other <br />9. Total Project Cost <br />G. Estimated Project Schedule <br />1. Date Construction should begin <br />2. Estimated Date Construction Completed <br />80,000 <br />23,875 <br />50,000 (est.) <br />See 3 above <br />N/A <br />S 1,773,875 <br />April 1990 <br />April 1991 <br />