Laserfiche WebLink
• <br />UTILITY EXTENSION AGREEMENT <br />• <br />PAGE 2 <br />(3) City hereby agrees to the construction and installation of an <br />extension of its utility main to said property commencing at <br />the nearest existing utility main of sufficient size and <br />capacity, thence along/thru City of La Porte rights of way <br />and/or easements to said Owner's property, provided, however, <br />that should City not possess all necessary rights-of-way <br />and/or easements to complete said extension, Owner shall be <br />solely responsible for obtaining said additional <br />rights-of-way and/or easements at no cost to City. Such <br />extension shall be of sufficient size and capacity to serve <br />all existing developed property to be served by the new <br />extension. City shall be the final authority in determining <br />sufficiency of the size and capacity of the extension. <br />(~I) Owner agrees to pay a portion of the fees for rights-of-way <br />or easement acquisition, surveying, engineering, preparation <br />of contract documents, soils investigations, permits, <br />construction staking, inspection, and materials testing. <br />Owner further agrees to pay a portion of the costs related to <br />the construction and installation of lines (B),(C),&(D) <br />including necessary appurtenances in conformance with City's <br />standards and specifications for said extension and <br />preparation of record drawings based on construction and <br />inspectors marked set. <br />(5) If the funds are available, the City of La Porte will <br />consider being responsible for the Engineering and <br />construction costs of Section (A) described as a 30" sanitary <br />sewer trunk main. <br />