Laserfiche WebLink
Dec. 28, 1989 <br />PRELIMINARY ESTIMATE <br />OF <br />PROBABLE CONSTRUCTION COST <br />(REVISED) <br />PROJECT: UNDERWOOD ROAD. -FROM SPENCER HIGHWAY TO PASADENA BLVD. <br />(Without Additional La Porte Drainage Area) <br />ITEM DESCRIPTION UNIT QUAN- COST TOTAL <br />NO. TITY C ) «) <br />Y x. Y Y Y.iR ai. iR.a(.aF dE•i[•.�,.x..�.aF eE •iF�. •*.* •*.*.x. �"� *'x' �E* �E dE iE dE dF dF dF jF iF iF �F 9F ** dE dF �E 9F 9EdE �F� dF� 9F �'�FdE dEjF dEdEiEdF*'�' �"� dE 9E=ic # is # � i <br />1 <br />PREP R.O.W. <br />2 <br />SEEDING & FERTILIZER <br />3 <br />REMOVE EXIST. PAVEMENT <br />4 <br />STRIPPING <br />5 <br />REMOVE & RESET CULVERT <br />6 <br />TYPE "D" H.M.A.C. <br />7 <br />8 IN. LIMESTONE BASE <br />8 <br />CONSTR. TRAF. CNTRL. DEV. <br />9 <br />TEMPORARY STRIPING <br />10 <br />PERMANENT STRIPING <br />11 <br />CERAMIC BUTTONS <br />12 <br />10 IN. REINF. CONC. PVMT. <br />13 <br />6 IN. CONC. CURB <br />14 <br />STABILIZATION OF SUBGR. <br />15 <br />LIME <br />16 <br />EXCAVATION <br />17 <br />DITCH INLETS -TYPE F <br />18 <br />CURB INLETS TYPE "B-B" <br />19 <br />MANHOLES (ALL DEPTHS) <br />20 <br />JUNCTION BOX <br />21 <br />24 IN. RCP (ALL CUTS) <br />22 <br />30 IN. RCP (ALL CUTS) <br />23 <br />36 IN. RCP (ALL CUTS) <br />24 <br />42 IN. RCP (ALL CUTS) <br />25 <br />48 RCP (ALL CUTS) <br />26 <br />IN. <br />54 N. RCP (ALL CUTS) <br />27 • <br />60 I N . RCP ( ALL CUTS) <br />28 <br />MEG IN. RCP (ALL CUTS) <br />29 <br />72 IN. RCP (ALL CUTS) <br />30 <br />78 IN. RCP (ALL CUTS) <br />31 <br />78 IN. CGMP <br />32 <br />4 FT x 8 FT BOX <br />33 <br />TUNNEL 8 X 4 CONCRETE BOX <br />34 <br />TRENCH SAFETY 5-10 FT. <br />35 <br />TRENCH SAFETY 10-15 FT. <br />36 <br />REMOVE GAS STOR TANKS <br />37 <br />INSTALL 12 IN. WATERLINE <br />38 <br />INSTALL FIRE HYDRANTS <br />TOTAL ALL ITEMS <br />ADD 10% CONTINGENCY <br />TOTAL <br />L.S. <br />1 <br />100,000.00 <br />100,000.00 <br />L.S. <br />1 <br />5,000.00 <br />5,000.00 <br />S.Y. <br />13334 <br />3.00 <br />40,OO2.00 <br />S.Y. <br />36076 <br />1.00 <br />36,076.00 <br />L.S. <br />1 <br />10,000.00 <br />10,000.00 <br />TON <br />760 <br />45.00 <br />34,200.00 <br />S.Y. <br />2366 <br />10.00 <br />23,660.00 <br />L.S. <br />1 <br />20,000.00 <br />20,000.00 <br />L.S. <br />1 <br />4,000.00 <br />4,000.00 <br />L.S. <br />1 <br />4,000.00 <br />4,000.00 <br />L.S. <br />1 <br />2,000.00 <br />2,000.00 <br />S.Y. <br />35808 <br />22.00 <br />787,776.00 <br />L.F. <br />10500 <br />1.50 <br />15,750.00 <br />S.Y. <br />37433 <br />1.50 <br />56,149.50 <br />TON <br />468 <br />80.00 <br />37,440.00 <br />C.Y. <br />26800 <br />4.00 <br />107y200.00 <br />EA. <br />4 <br />2,500.00 <br />10,000.0c <br />EA. <br />44 <br />1,500.00 <br />66,000.O <br />EA. <br />23 <br />3,000.00 <br />69,000.0( <br />EA. <br />1 <br />5,000.00 <br />5, 000..0C <br />L.F. <br />1835 <br />25.00 <br />45,875.0C <br />L.F. <br />725 <br />35.00 <br />cv25,375.0C <br />L.F. <br />375 <br />40.00 <br />415,000.0C <br />L.F. <br />525 <br />55.00 <br />(�28,875.0C <br />L.F. <br />500 <br />80.00 <br />40,000.0c <br />L.F. <br />325 <br />95.00 <br />30,875.0( <br />L.F. <br />830 <br />110.00 <br />91,300.0( <br />L.F. <br />660 <br />135.00 <br />69, lot" ).Of <br />L.F. <br />300 <br />160.00 <br />48,000.0( <br />L.F. <br />1905 <br />180.00 <br />342, 900. C)( <br />L.F. <br />550 <br />180.00 <br />9,000.o( <br />L.F. <br />295 <br />DSO 18500 (,6 <br />,Po 54, 575. 0( <br />L.F. <br />66 <br />300:00� <br />19, 800. i �( <br />L.F. <br />2115 <br />5.00 <br />10,575.0( <br />L.F. <br />4350 <br />10.00 <br />43, 500— CM <br />L.S. <br />1 <br />50,000.00 <br />50,000.0( <br />L.F. <br />5400 <br />20.00 <br />108, 0o0. 0( <br />EA. <br />9 <br />1,500.00 <br />13,500.0 <br />2,499,503.E <br />249,950.3 <br />2,749,453.G <br />