Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />CITY OF LA PORTE <br />INTER-OFFICE MEMORANDUM <br />MAY 25, 1990 <br /> <br />I <br /> <br />SUBJECT: <br /> <br />Buildings to be deleted from demolition list <br /> <br /> <br />TO: <br /> <br />Mayor and City Council <br /> <br />FROM: <br /> <br />Joel Albrecht, Director of Community Developmen <br /> <br />THROUGH: <br /> <br />Robert Herrera, City Manager <br /> <br />Staff is suggesting that three (3) buildings be deleted from <br />the City's demolition list. The buildings are: <br /> <br />1) 200 South Fifth Street <br />2) 314 North Sixth street <br />3) 1500 South Broadway <br /> <br />The first of the buildings is 200 South Fifth. This <br />building is being demolished by the owner. At the time this memo <br />is being written, demolition is virtually completed. The owners, <br />in conjunction with their demolition permit, have posted a <br />$200.00 cash bond. This bond is to be held until all demolition <br />and clean up is completed. Should the job be abandoned before <br />completion, the bond will more than pay for any remaining work. <br />Based on the demolition contractor's bid, deletion of this <br />building will represent a $200.00 savings. <br /> <br />The second of the buildings, 314 North Sixth Street, has <br />since the date of condemnation, been sold. The new owners have <br />stated their intention to demolish the structure. They are <br />currently soliciting bids for demolition of the structure. <br />Deleting this building from the demolition list will represent a <br />$2,000.00 savings. <br /> <br />The final building, 1500 South Broadway, is in a relatively <br />isolated location. The blighting influence of the building is <br />therefore, somewhat less than that of the other buildings. <br />Deletion of this building would represent a contract savings of <br />$1,200.00. The building will be demolished as soon as alternate <br />funds can be made available. <br /> <br />Removing these three (3) buildings from the demolition list <br />will allow an overall savings of $3,400.00. The contractor's <br />demolition bid of $20,400.00 was higher than expected and <br />exceeded the budgeted project funds by approximately fifteen (15) <br />per cent. Reducing the contract amount by $3,400.00 will bring <br />the total project cost down to $17,000.00 which is within budget. <br />