My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1990-10-22 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1990
>
1990-10-22 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:02 PM
Creation date
7/31/2025 10:44:54 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/22/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />kECtti .~;T F i .ITY .b 1N .T AGENDA IT .M <br />Agenda Date Requested: October 22, 1990 <br />Requested By: Steve Gillett Department: Public Works <br />Report Resolution XXX Ordinance <br />Exhibits: Recommendation from Espey, Huston & Associates, Inc. <br />Bid Tabulation <br />Ordinance No. 1731 <br />SUMMARY & RECOMMENDATION <br />Sealed bids were received on September 24, 1990 for the construction of a <br />five hundred thousand {500,000) gallon elevated water storage tank, with <br />alternate bids for a seven hundred fifty thousand (750,000) gallon tank. <br />The proposed tank was identified in the City's water system master plan to <br />provide adequate storage for the west and northwest portion of the City, <br />including the potential service area north of SH 225, and will be <br />constructed utilizing funds from the 1990 Revenue Bond Fund. <br />Bids were received from four (4) prequalified contractors, with a low base <br />bid received from Landmark Structures, Inc. (LSI) for a 500,000 gallon <br />composite (steel tank/concrete pillar) style tank in the amount of five <br />hundred twenty-two thousand two hundred forty-seven dollars {$522,247.00). <br />LSI also submitted the lowest alternate bid for a 750,000 gallon tank of <br />the same composite style in the amount of six hundred thirty one thousand <br />nine hundred seventy nine dollars ($631,979.00). <br />Adequate funds are budgeted to construct either size tank., The 500,000 <br />gallon tank is the minimum size required to ensure compliance with the <br />Texas Department of Health for the next twenty (20) years. However, <br />constructing a 750,000 gallon tank will ensure the City's elevated storage <br />needs well beyond the 20-year planning period. The average construction <br />cost for elevated storage is usually $1.00/gallon. Low bid for the 500,000 <br />gallon tank is $1.04/gallon, with the 750,000 gallon tank $0.84/gallon, or <br />$0.44/gallon for the cost of the additional 250,000 gallons. <br />The bid for the larger tank is extremely advantageous to the City. As <br />adequate funds are available, I recommend the City award the bid to <br />Landmark Structures, Inc. for a 750,000 gallon composite elevated water <br />storage tank in the amount of $631,979.00. <br />Action Required by Council: Approve ordinance authorizing contract with <br />Landmark Structures Inc. for a 750,000 gallon composite elevated water <br />storage tank in the amount of. $631,979.00. <br />Availability of Funds: <br />General Fund <br />Capital Improvement <br />XXX Other: 1990 Revenue Bond Fund <br />Account Number: 035-804-620-5205 <br />Water/Wastewater <br />General Revenue Sharing <br />Funds Available: XX YES NO <br />improved for Ci,`ty Council Agenda <br />Robert T. Herrera DATE <br />City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.