My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1990-10-22 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1990
>
1990-10-22 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:02 PM
Creation date
7/31/2025 10:44:54 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/22/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Agenda Date Requested: October~22t 1.990__ <br />Requested By: Steve Gillett Department: Public Works <br />Report <br />Resolution XXX Ordinance <br />Exhibits: Recommendation from Espey, Huston & Associates, Inc. <br />Bid Tabulation <br />Change Order No. 1 <br />Ordinance No. 1733 <br />SUMMARY & RECOMMENDATION <br />Sealed bids were received on September 24, 1990 for the construction of the <br />East La Porte Relief Sewer. The proposed construction was identified in <br />the City's Wastewater Master Plan to provide relief from overloaded sewer <br />conditions on the east side of La Porte. The Project will be constructed <br />utilizing futldS from the 1990 Bond Fi~tnd. <br />Bids were received from eight (8) prequalified construction firms, with <br />low bid received from E.P. Brady Inc. in the amount of one million five <br />hundred eighty four thousand one hundred thirty eight dollars and seventy <br />five cents ($1,584,138.75). The Engineer's estimate for this project is <br />one million four hundred forty thousand eight hundred eighty two dollars <br />($1,440,882.00), or one hundred forty three thousand two hundred fifty six <br />dollars and seventy five cents ($143,256.75) less than the lowest bid. <br />In order to reduce the overall cost of the project to an amount closer to <br />the Engineer's estimate, the City, Engineer and contractor met to discuss <br />possible cost-saving measures, without compromising ttie quality of the <br />project. Those measures identified and agreed upon by all parties are <br />incorporated in Change Order No. 1, and represent a total reduction of <br />eighty eight thousand eight hundred forty tl~tree dollars and seventy five <br />cents ($88,843.50) over the original bid, for a revised contract amount of <br />one million four hundred nirtety five thousand two Yturtdred ninety five <br />dollars and twenty five cents ($1,495,295.25). <br />Action Required by Council: Approve ordinance authorizing the contract and <br />Change Order No. 1 with E.P. Brady, Inc. for the construction of the East <br />La Porte Relief Sewer in tYte amount of $1,495,?.95.25. <br />Availability of Funds: <br />general Fund <br />Capital Improvement <br />xXX Other - 1990 Bond Fund <br />Account Number: 035-806-610-510 <br />Water/Wastewater <br />__ General Revenue Sharing <br />Funds Available: XX YES NO <br />Approved for Citty Council Agenda r Q <br />Robert T. Herrera DATE <br />City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.