My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1990-10-22 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1990
>
1990-10-22 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:02 PM
Creation date
7/31/2025 10:44:54 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/22/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ESPEY, <br />HUSTON & <br />ASSOCIATES, INC. <br />Engineering & Environmental Consultants <br />October 15, 1990 <br />Mr. Stephen L. Gillett <br />Director of Public Works <br />City of La Porte <br />P.O. Box 1115 <br />La Porte, Texas 77571 <br />RE: East La Porte Relief <br />Sewer and Lift Station <br />Dear Steve: <br />• <br />EH&A Job No. 12355-40 <br />We have completed our review of the bids received on September 24, 1990 for the above <br />referenced project and recommend for City Council approval the award of the construction <br />contract to E.P. Brady, Inc. <br />The low bid was submitted by E.P. Brady, Inc. in the amount of $1,584,138.75 and was <br />accompanied by an adequate bid security. A copy of the bid tabulation is enclosed for your <br />information. Our review of the low bid indicated that all items on the proposal were properly <br />filled out and were competitive with all other bidders. <br />Due to the low bid exceeding budget projection, there has been an extensive evaluation of all <br />aspects of the project with E.P. Brady, Inc. to determine if there are any areas of potential cost <br />savings. Several minor items were identified and those which were acceptable have been included <br />in the attached change order No. 1. This change order is recommended for approval concurrently <br />with the contract. The change order causes a reduction of $88,843.50 in the contract, or a total <br />contract amount of $1,495,295.25. <br />Should you have any questions or require any additional information, please do not hesitate to <br />contact us. <br />Sincerely, <br />Dale Conger, P. . <br />Project Manager <br />Houston Division <br />DDC/WHP/ic <br />Enclosures <br />888 West Belt Dr. South, Suite 200 • Houston, TX 77042 • (713) 781-8800 • FAX (713) 781-8010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.