Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />COMMUNITY DEVELOPMENT BLOCK GRANT FY 1991 <br />PAGE 2 OF 2 <br /> <br />Item number two needs to be discussed further because the estimated <br />total cost of the project is $600,000.00. Therefore, the project <br />will need to be broken down into more than one segment if it is to <br />be considered. <br /> <br />A complete drainage area study of existing conditions should be <br />done and then the proposed storm drainage system could be designed. <br />The actual construction of the two storm drainage lines could come <br />from future Block Grant applications. It is estimated that the <br />construction cost of each storm drainage line will be approximately <br />$275,000.00 <br /> <br />The City Council will need to consider the recommendations from the <br />Commission, as well as other input that might be provided at their <br />meeting on December 10, 1990. The City Council will also need to <br />establish a priority rating to the proposed projects. Staff will <br />then prepare a grant request for submittal to the Harris County <br />Community Development Agency by January 4, 1991. <br /> <br />See letter from Harris County Community Development Agency. <br /> <br />JJjJHAjneb <br /> <br />Attachment <br />