My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1991-08-12 Joint Public Hearing and Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1991
>
1991-08-12 Joint Public Hearing and Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:52:09 AM
Creation date
7/31/2025 10:45:40 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
8/12/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Agenda Date Requested: August 12 991 _ <br />R <br />Requested By: Steve Gillett Department: ..,-Public Works <br />XXX Report <br />Resolution <br />Exhibits: Memorandum from Steve Gillett <br />SUMMARY & RECOMMENDATION <br />Ordinance <br />One of the main lift pumps in the wastewater treatment plant failed on July <br />10, 1991. All -Pump Company, the authorized repair facility for Hydromatic <br />Pumps in this area, was contacted for disassembly and repair estimates. A <br />quote of eight thousand, nine hundred and eighty-five dollars ($8,985.00) <br />was submitted for the necessary repairs to the pump. The cost of a new <br />pump would be approximately $14,500.00 with a six (6) week delivery time. <br />The delivery time required on a new pump does not make this a viable <br />option. <br />The loss of the pump is not critical to operations during normal operating <br />conditions; however, during periods of wet weather, it would be difficult <br />to keep the flows in the influent sewer mains at a level to prevent <br />overflows and backups elsewhere in the sewer system. Due to the current <br />wet weather pattern and it being hurricane season, a decision was made to <br />authorize All -Pump Company to proceed with repairs at a cost of $8,985.00. <br />The pump was repaired and placed back in service on July 26, 1991. <br />Staff recommends authorization for emergency repairs to the pump in an <br />amount of eight thousand, nine hundred and eighty-five dollars ($8,985.00) <br />Funds for this repair are available in the Wastewater Treatment Division's <br />Operating Budget. <br />Action Required by Council: Authorize emergency repairs to one of the main <br />lift pumps at the wastewater treatment plant by All -Pump Company in the <br />amount of $8,985.00. <br />Availability of Funds: <br />General Fund <br />Capital Improvement <br />Other <br />XXX Water/Wastewater <br />_ General Revenue Sharing <br />Account Number: 002-806-807-408 Funds Available: XX YES NO <br />
The URL can be used to link to this page
Your browser does not support the video tag.