My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1992-04-13 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1992
>
1992-04-13 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:03 PM
Creation date
7/31/2025 10:46:26 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
4/13/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • <br />MAl'~~'~T~N~~~, <br />E1'~1G~hIE~RZNG <br />CORPQRATI,ON~~,~~ <br />ATTACHMENT A <br />CITY OF LA FORTE <br />LOMAB RAW SEWAGE FORCE MAIN DIVERSION <br />SCOPE OF SERVICES <br />BASIC SERVICES <br />A. PRELIMINARY PHASE <br />1. MEET WITH CITY OF LA FORTE TO DETERMINE ROUTE AND <br />CROSSING ALTERNATIVES AT BIG ISLAND SLOUGH AND FAIRMONT <br />PARKWAY AND DISCUSS APPURTENANCES. <br />2. MEET WITH HARRIS COUNTY IN REGARD TO ROUTING IN THE <br />FAIRMONT PARKWAY RIGHT OF WAY AND DETERMINE IF THE <br />PROPOSED NEW BRIDGE AT THE BIG ISLAND SLOUGH CROSSING <br />WILL HAVE ANY AFFECT ON THE CROSSING LOCATION OR <br />CONSTRUCTION. DETERMINE WHAT, IF ANY, DESIGN CRITERIA <br />THE COUNTY WILL REQUIRE. <br />3. MEET WITH HARRIS COUNTY FLOOD CONTROL DISTRICT IN REGARD <br />TO ROUTING ALONG AND ACROSS BIG ISLAND SLOUGH. DETERMINE <br />WHAT DESIGN CRITERIA THE DISTRICT WILL REQUIRE. <br />B. DESIGN PHASE <br />1. PREPARE PLANS AND SPECIFICATIONS FOR REVIEW BY CITY OF <br />LA FORTE STAFF. PLANNING MATERIAL SHALL AT A MINIMUM <br />SHOW THE DIVERSION OF THE 16 INCH FORCE MAIN OFF OF LIFT <br />STATION 30 TO THE TIE IN MANHOLE FOR THE 48" BRANCH <br />CONNECTION FOR THE FAIRMONT PARKWAY TRUNK SEWER AS THE <br />SECOND ALTERNATIVE IS OUTLINED IN THE PRELIMINARY <br />INVESTIGATION REPORT DATED MARCH 1992 (COPY ENCLOSED). <br />HARRIS COUNTY FLOOD CONTROL AND HARRIS COUNTY <br />DESIGN/CONSTRUCTION REQUIREMENTS WILL BE INCORPORATED <br />INCLUDING INFORMATION REGARDING THE ULTIMATE DITCH <br />SECTION FOR BIG ISLAND SLOUGH AND THE PROPOSED NEW BRIDGE <br />LOCATION ON FAIRMONT PARKWAY. <br />THE TEXAS WATER COMMISSION DESIGN CRITERIA WILL BE <br />FOLLOWED IN ALL ITS PARTICULARS. <br />2. UPON COMPLETION OF CITY OF LA FORTE REVIEW MAKE THE <br />INDICATED REVISIONS AND/OR ADDITIONS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.