Laserfiche WebLink
<br />~- C ~ ~ r~..n- r"C c--. SLI:CGc <br />CJ <br />,;. what is the final d'sposition o' sludge fron your treatr.:ent plant? <br />HAZELWOOD ENTERPRISES LANDFILL, BAYTOWN, TX <br />PERMIT N0. 1535 <br />Q. Cescribe sludge manager~ent practices AS NEEDED DA <br />R.A.S. IS DIVERTED TO THE AEROBIC DIGESTER. <br />SLUDGE IS PUMPED TO THE GRAVITY THICKNER AND THEN AS NEEDED TO <br />THE BELT PRESS FOR DEWATERING. THE DEWATERED SLUDGE IS <br />TRANSPORTED TO A LANDFILL FOR FINAL DISPOSAL. <br />C. If sludge is disposed of by land application (surface application or <br />shallow injectionl, complete the following: N/ A <br />(1} Ooes your facility have access, to sufficient land for: (Circle <br />the appropriate point total.) <br />3 or more years = 0 points <br />Z4-35 months = 10 points <br />12-23 months = 20 points <br />6-12 months = 30 points <br />less than 6 months = 50 points <br />(2) 4~'hat type of cover 15 on the site? <br />N/A Crops consumed by animals whose products are consumed <br />by humans. <br />N/A Crops that are directly consumed by humans. <br />N/A P~either directly or indirectly consumed by humans. <br />N/A No plant cover. <br />10 <br />