My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1993-01-11 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1993
>
1993-01-11 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:48:39 AM
Creation date
7/31/2025 10:47:01 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
1/11/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Agenda Date Requested: January 11, 1993 <br />Requested By: Charles Harrington (4-f Department: Planning <br />Report Resolution XXX Ordinance <br />Exhibits: 1. Ordinance 93-18.81 <br />SUMMARY & RECOMMENDATION <br />Background <br />During the November 16, 1992, City Council meeting, Council <br />authorized the expenditure of $ 90,960 for the rehabilitation of <br />Coupland Dr. During the report on the project, the discussion <br />centered around the injection process of Uretek USA, Inc that would <br />lift the street and create a positive drainage flow of water. The <br />firm has basically completed their portion of the project, but the <br />process has revealed some additional work necessary to complete the <br />project which we could not have anticipated in our original <br />proposal. <br />In raising the street, we have created some ponding in several <br />driveways that were not connected to the street. In order to <br />correct the problem, we are proposing to use the Uretek process and <br />raise these driveways to meet the new elevation requirements. In <br />addition, several sections of curb and gutter are missing and the <br />lack of curb constraints has caused some runoff water to pool in <br />adjoining lots. We propose to install approximately 300 ft. of <br />curb and gutter to enhance the water flow in those areas. The <br />final item needing to be addressed is that of adjoining properties <br />now being lower than the back of the curb. In order to solve the <br />situation, we propose to provide stockpiles of sand in strategic <br />areas that property owners may use to gradually raise the elevation <br />of their property. <br />Recommendation <br />The staff recommends the transfer of $ 9,096 from the Capital <br />Improvement Contingency Fund to the Coupland Dr. Project to create <br />a contingency account for the completion of the project. <br />Action Required by Council: <br />Approve an ordinance authorizing the transfer of $ 9,096 from the <br />Capital Improvement Contingency Fund to the Coupland Dr. Project to <br />create a contingency account. <br />Availability of Funds: <br />General Fund Water/Wastewater <br />XXX Capital Improvements General Revenue <br />Other Sharing <br />Account No.:015-700-430-900 Funds Available: XX Yes No <br />Approved for City Council Agenda <br />Robert T. Herrera Date <br />City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.