My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1993-01-25 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1993
>
1993-01-25 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:49:37 AM
Creation date
7/31/2025 10:47:03 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
1/25/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REST FOR CITY COUNCIL AGENDdk TEM <br />Agenda Date Requested: January 1993 <br />Requested By: Steve Gillett Department: Public Works <br />XXX Report <br />Resolution <br />Exhibits: 1. Memorandum From Public Works <br />SUMMARY & RECOMMENDATION <br />Ordinance <br />One of the two process water pumps at the Treatment Plant has failed. The <br />pump is part of the original plant equipment installed in the early 80's. <br />These pumps supply treated effluent for wash down, chlorination equipment, <br />dechlorination equipment, belt press, and to seals in many of the lift <br />pumps. One pump can provide all of the needed water for the plant; <br />however, a failure of the remaining pump will not allow operations to <br />continue in many of the plant units. Should this occur, the plant will be <br />unable to continue meeting the parameters of its discharge permit. <br />The failed pump was inspected by Layne -Texas Company and was found to have <br />severe deterioration in the pump bowl, pump column, line shaft, and <br />mechanical seal. A price of $5,812.00 for repairs to the pump was quoted <br />by Layne -Texas. A new pump, installed, was quoted at $6,840.00. The <br />Purchasing Department has contacted several vendors for pricing of <br />replacement, and is in the process of evaluating this equipment, with the <br />assistance of the Treatment Plant Supervisor. Of critical importance in <br />this replacement is the delivery time required, whether installation is <br />included, and the specifications of the equipment quoted, in addition to <br />the price. Purchasing will continue investigating the quickest, most cost- <br />effective vendor for purchase of the pump. <br />Because of the critical importance of this equipment to the plant process, <br />it is recommended that an emergency be declared, and the purchase of a pump <br />be authorized not to exceed $7,000.00 with the vendor selected on the basis <br />of delivery time and cost in relationship to service and specification. It <br />is further recommended transfer of funds within the Wastewater Treatment <br />Operating Budget be authorized, from the Equipment Maintenance portion of <br />the budget to the Capital Equipment portion. <br />Action Required by Council: <br />Authorize emergency purchase of plant water pump in an amount not to exceed <br />$7,000.00. Authorize transfer of funds from 002-806-807-402 to 002-806- <br />807-821 to cover the expenditure. <br />Availability of Funds: <br />General Fund XXX Water/Wastewater <br />Capital Improvement General Revenue Sharing <br />Other <br />Account Number: 002-806-807-821 Funds Available: X_YES NO <br />Ror/fa <br />. Herrera <br />Cinager <br />DZ�j <br />DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.