Laserfiche WebLink
L <br />i • <br />BID TABULATION - TRENCH SHORING EQUIPMENT <br />DESCRIPTION <br />ITEM ##1 - VERTICAL HYDRAULIC <br />1. Shoring & cylinders (7) <br />2. Plywood (14) <br />3. Pump can (2) <br />4. Tools (2) <br />TOTAL ITEM #1 <br />ITEM #2 - MODULAR <br />1. Panels (4) <br />2. Panel connectors (4) <br />3. Struts (2) <br />TOTAL ITEM #2 <br />* 1 set of lifting eyes <br />GRAND TOTAL <br />ICM OF HOUSTON SAFETY LIGHTS PLANK COMPANY <br />$367.50 $405.00 $398.00 <br />$102.00 $110.00 $115.00 <br />$307.50 $375.00 $350.00 <br />$24.00 $20.00 N/C <br />$4,663.50 $5,165.00 $5,096.00 <br />$581.00 $640.00 <br />$135.95 $200.00 <br />$103.13 $228.00 <br />$3,074.06 $3,815.00 <br />$75.00 <br />$7,812.56 $8,981.00 $5,096.00 <br />