My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1993-11-08 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1993
>
1993-11-08 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:04 PM
Creation date
7/31/2025 10:47:46 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
11/8/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />dEST FOR CITY COUNCILAGE~ ITEM <br /> <br />Agenda Date Requested: <br />Requested By: f./ <br />X Report <br /> <br /> <br />Department: Planning <br /> <br />X Ordinance <br /> <br />Exhibits: <br />1. Ordinance <br />2. Bid Tabulation <br />3. Bidders Ust <br />4. Letter of Support <br />5. Change Order <br /> <br />SUMMARY & RECOMMENDATION <br /> <br />Background <br /> <br />During the FY 1994 budget process, the Council considered and authorized the <br />expenditure of $180,000.00 for the construction of a cover for the livestock/rodeo arena <br />in Northwest La Porte. <br /> <br />On November 1, the City received bids from eight (8) contractors to design and build the <br />proposed covered facility. Attached is the bid tabulation sheet for the project. As shown, <br />the firm of Frost Constructors, Inc. was the low bidder in the amount of $191,077.00. As <br />this amount was $11,077.00 greater than the total amount budgeted, the staff met with <br />representatives of Frost Constructors and Whirlwind Building Systems to determine if <br />there were some change orders that could be made to bring the building within budget. <br />It was proposed that we allow limited x-bracing in the sidewalls and that we delete the <br />turn-down wall sheets on the building. As shown on the attached change order proposal <br />from Frost Constructors, this brought the cost of the building down to $179,677.00 which <br />is within the proposed budget. While the $180,000.00 budgeted does not allow for any <br />contingencies, the funds that have been previously contributed have earned interest in the <br />amount of $7,562.58, and it will be used for any contingencies on the project. These <br />proposals have been presented to and accepted by the La Porte Uvestock Show and <br />Rodeo Association. <br /> <br />Recommendation <br /> <br />The staff recommends acceptance of the low bid of $191 ,077.00 from Frost Constructors, <br />Inc. and the approval of Change Order #1 in the amount of < $11,400.00 > for a contract <br />amount of $179,677.00. <br /> <br />Action Required by Council: <br /> <br />Approve an ordinance accepting the low bid of Frost Constructors, Inc. in the amount of <br />$191,077.00 and approving Change Order #1 which reduces the bid by $11,400.00 for <br />a contract amount of $179,677.00. Said ordinance further establishing a contingency for <br />total available funding of $187,562.58. <br /> <br />Availability of Funds: <br /> <br />General Fund <br />---X- Capital Improvement <br />Other <br /> <br />Water /Wastewater <br />General Revenue Sharing <br /> <br />Account Number: <br /> <br />015-662-520-100 <br /> <br />Funds Available: X YES _NO <br /> <br />Approved for City Council Agenda <br /> <br /> <br />Robert ~/L. <br />City Ma a r <br /> <br />r~ <br /> <br />DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.