My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1994-06-13 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1994
>
1994-06-13 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:50:25 AM
Creation date
7/31/2025 10:48:19 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/13/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• REQUEST FOR CrrY COUNCI&ENDA ITEM <br />Agenda Date Requested: June 13. 1994 <br />Requested By: Charles Harrington W Department: Planning <br />Report <br />Resolution XX Ordinance <br />Exhibits: 2. Letter from Architect Ordinance <br />�. Bid tabulations 5. Bid Schedule/Bidder's List <br />!�. Letter with proposed split of project <br />• , �� _ ,I7t�•I�a <br />During the 1993-94 Budget Process, Council authorized the repair and improvement to <br />the municipal jail facility. The architectural firm of Ray & Holiington prepared drawings <br />that included the renovation of the facility for life safety concerns found during earlier <br />reports on the facility. The architects's original estimate produced for the proposed <br />renovation came in approximately 25% under the budgeted $ 100,000 for the project. <br />With this encouraging news, several items were added to the project including a sallyport <br />for the handling of arriving prisoners, relocation of emergency exit stairs and relocation <br />of the generator room. With these additions, the project was bid on May 2, 1994. The <br />City received 5 bids with a low bid of $167,000 from the firm of Commodore Construction <br />Corporation. <br />Staff feels that the bids are competitive. The bids are closely grouped as the spread <br />between the low and high bid is 12%. Unfortunately, the low bid exceeds available funds <br />by 67%. Staff then reviewed options that would allow the project to proceed. The option <br />recommended by staff is to delete all exterior work from the contract which includes the <br />sallyport, relocation of the exit stair, and the relocation of the generator. Accordingly, staff <br />had the low bidder prepare such a deletion and then establish the cost to add these to <br />the contract in the future. With this provision in place, the project's additional cost could <br />be considered in the new budget year and the deleted work items added back to the <br />contract prior to closeout. The attached letter from the architect reflects that proposal. <br />The proposed price for the interior remodeling of the jail facility is $112,400. At a period <br />in the future within a 120 day window, the City could request an addendum to the <br />contract in the amount of $ 56,200 to add the deleted items to the contract. <br />Recommendation <br />The $ 100,000 originally budgeted has earned approximately $ 9,8W in interest which <br />could be applied to this project. After architectural fees have been paid there will be <br />approximately $ 101,800 available for construction. <br />The staff recommends the approval of a contract to Commodore Construction <br />Corporation in the amount $112,400 for the interior remodeling of the jail facility and the <br />creation of a $ 5,000 contingency account. In addition, the staff recommends that the <br />Council during the FY 1995 Budget process consider allocating an additional $ 56,200 for <br />the exterior remodeling of the jail facility. <br />Action Required by Council: <br />Approve an ordinance authorizing the City Manager to enter into a contract with <br />Commodore Construction Corporation and execute Change Order No. 1 establishing a <br />contract price of $112,400 for the interior renovation of the municipal jail facility and further <br />authorizing that a contingency in the amount of $ 5,000 be established. Change Order <br />No. 1 is to establish the above prices for adding the exterior remodeling to the project. <br />This ordinance would also authorize the appropriation of $ 17,400 from the Capital <br />Improvement Fund Contingency for this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.