Laserfiche WebLink
VEST FOR CITY COUNCIL AGENDA I <br />Agenda Date Requested: Januar 23 1995 <br />Requested By: S. Gillett - Department: Public Works <br />Report Resolution XXXX Ordinance <br />Exhibits: Ordinance No. 95- <br />Letter of Agreement <br />SUMMARY & RECOMMENDATION <br />The Fairmont Park Elevated Water Storage Tower was identified in the City's bi-annual <br />Water Storage Tank Inspection Program for rehabilitation by the consultant, Jim Dunham, <br />P.E. The Project consists of removal of existing coatings and recoating of the interior <br />and exterior of the tank. Shrouding of the structure will be required by the TNRCC air <br />quality rules during removal operations. Structural improvements include extension of the <br />overflow to ground level, replacing portions of balcony plate, improvements to the safety <br />climbing equipment and ladders, and installation of new, larger manways to conform to <br />TNRCC regulations. A total of $175,000 has been budget for this project. New TNRCC <br />regulations on lead removal, protection of adjacent structures from blasting, and existing <br />and upcoming certification requirements for the Engineer and Contractor has caused, and <br />will continue to cause engineering and construction costs to rise. Due to the specialized <br />nature of the work, the City has requested Mr. Dunham, who also performs the bi-annual <br />inspection of the City's water storage tanks, to furnish the following services as <br />outlined in the attached Letter of Agreement. <br />Design Phase Services - Reinspect the .project to determine current condition, develop <br />plans and specifications suitable for bidding to comply with AWWA specifications and TNRCC <br />regulations, recommend paint system(s), develop coating options, update the cost estimate <br />and secure all regulatory approvals and permits. <br />Bidding Phase - Develop qualified bidders list and distribute bidding documents, advertise <br />work in contractor clearing houses, attend and conduct prebid meeting and clarify bid <br />document to bidders, attend bid opening, prepare bid tabulation and provide written <br />recommendation for award of bid. <br />Construction Phase Services - Attend and conduct preconstruction conference, interpret <br />contract documents, process payment requests, review and approve shop drawings, evaluzte <br />and prepare change orders and certify completion of Project. Provide two (2) inspections <br />of project to ensure compliance with specifications and provide and interpret necessary <br />testing of spent blasting sand to ensure compliance with lead regulations. <br />Inspection Services - Provide periodic inspection of the work, in addition to basic <br />services, to ensure compliance with contract. A total of twelve (12) site visits are <br />estimated, at approximately eight (8) hours each. <br />Compensation of basic services will be fixed-fee, with inspection at hourly rate, <br />including all expenses, as follows. <br />Basic Services <br />Design Phase $ 8,876.25 <br />Bidding Phase 1,183.50 <br />Construction Phase 1,775.25 <br />Total Basic Services $11,835.00 <br />Inspection <br />100 hours @ $60/hr (not to exceed). S 6,000.00 <br />Total Project Engineering Coste X17,835.00 <br />Action Required by Council: Approve proposal from Jim Dunham, P.E. to provide engineering <br />and inspectional services for the repainting of the Fairmont Elevated Water Storage Tower <br />for a total coat of.$17,835.00. <br />Availability of Funds: <br />General Fund Water/Wastewater <br />XXXX Capital Improvement General Revenue Sharing <br />Other <br />Account Number: 003-706-620-100 Funds Available: XX YES NO <br />Approved for City Council Aaenda <br />Robert T. Herrera DATE <br />City Manager <br />