My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1996-02-12 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1996
>
1996-02-12 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:06 PM
Creation date
7/31/2025 10:49:32 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
2/12/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />CHANGE OWNER ^ • <br />ARCHITECT ^ n '~ <br />ORDER CONTRACTOR D ~ W' U~ ~ ~ j <br />AIA DOCUMENT G701 FIELD ^ (((...///"'lll]]] ~f ~j <br />OTHER ^ <br />PROJECT: City of La Porte -Special Programs CenterCHANGE ORDER NUMBER: One (O1) <br />(name, address) 1302 S. Broadway <br />La Porte, Texas 77571 DATE: 05 February 1996 <br />TO CONTRACTOR: ARCHITECT'S PROJECT NO: 9257 <br />(name, address) Commodore Construction CONTRACT DATE: <br />55 Lyerly, Suite 100 <br />Houston, Texas 77022 CONTRACT FOR: General Construction <br />The Contract is changed as follows: <br />Incorporate Items 1.01 through 1.04 as listed on Attachment "A". <br />Not valid until signed by the Owner, Architect and Contractor. <br />DEDUCT $39,015.00 <br />The original (Contract Sum) was ........................ ~ 578,000.00 <br />Net change by previously authorized Change Orders ............................... $ _0_ <br />The (Contract Sum) prior to this Change Order was .......... ~ 57$,000.00 <br />The (Contract Sum) (^••^-^^*°°~' *"^°'^,••^• °•~^°' will be (~rease~} (decreased) <br />~••^a) by this Change Order in the amount of ............................ i (39,015.00) <br />The new (Contract Sum) including this Change Order will be .. ~ 538,985.00 <br />The Contract Time will be (±ncre^^°-±~ ~-+e^-e^^°-+~ (unchanged) by Z6r0 ~ (_O_ )days. <br />The date of Substantial Completion as of the date of this Change Order therefore is unchanged x 210 days following <br />date of Notice to Proceed. <br />NOTE: This summary does no[ reflect changes in the Contract Sum, Contract Time or Guaranteed Dlasinrum Price which have been authorized by <br />Construction Change Directiee. <br />Ray & Hollington Architects, Inc. <br />Commodore Construction <br />Citv of La Porte <br />ARCHITECT <br />2365 Rice Blvd., Ste. 202 <br />Address <br />Houston, Texas 77005 <br />CONTRACTOR <br />55 Lyerly, Suite 100 <br />Address <br />Houston, Texas 77022 <br />OWNER <br />604 West Fairmont Parkway <br />Address <br />La Porte, Texas 77571 <br />BY BY BY <br />DATE DATE DATE <br />I , CAUTION: You should sign an original AIA document which has this caution printed in red. <br />An original assures that changes will not be obscured as may occur when documents are reproduced. <br />AIA DOCUMENT G701 • CHANGE ORDER • 1987 EDITION • AIA° • ©1987 • THE <br />AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHLNGTON, D.C. 2(H)OG G701-1987 <br />WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.