Laserfiche WebLink
<br />e <br /> <br />-. <br /> <br />, CITY OF LA PORTE <br />PUBLIC WORKS <br />! DEPARTMENT <br /> <br />I <br /> <br />Memo <br /> <br />To: Knox Askins, City Attorney ~ <br />From: Steve Gillett, Director of Public Works- 2~~ <br />CC: Martha Gillett, City Secretary if <br />Date: 09/23/97 <br />Re: Pipeline Permit <br /> <br />The ARCO Pipe Line Company has requested a permit to construct two (2) pipelines <br />within the City of La Porte. One, a 4.5-inch line, will transport Anhydrous Ammonia at <br />an operating pressure of 400 psig and a temperature of 1500 F. The other pipeline, <br />18 inch, will transport Anhydrous Hydrogen Chloride at an operating pressure of 225 <br />psig and a temperature of .1500 F. The company has paid a total of $1,000 for.th~ <br />$300 permit fee and $200 annual fee for each line. All requirements of Ordinance <br />No. 915 have been met. <br /> <br />Please prepare an ordinance granting a permit to ARCO Pipe Line Company to <br />construct these two lines. I anticipate placing this on the upcoming October 13, 1997 <br />council meeting. <br /> <br />fI) Page 1 <br />