Laserfiche WebLink
<br />e. <br /> <br />e <br /> <br />Page 2 <br /> <br />It is my understanding that Mr. Green presented to Mr. ASkins. comments <br />regarding abandonment of the.underground fuel tanks that are in the <br />present location as long as it complies with state law. This would then <br />be in line with the" new lease and abandonment of the tanks. If this is <br />correct, then the penalty clause would be corrected to delete under <br />ground storage tanks on item F. <br /> <br />There will be a Phase I inspection completed to provide a benchmark <br />for the environmental study at our expense. Mr.-Green discussed with <br />Mr. Askins, a request that the lease be subject to the inspection, or <br />that if the inspection discovered a problem, that it would be the city <br />responsibility to correct at their expense. I believe that this does <br />not prevent us from going forward, but only clarifies respons"ibilities. <br />Apparently Mr. Askins did not have a problem with this clarification. <br /> <br />These discussions have been difficult for both sides. At times, we <br />have felt that the City-of La Porte has singled out Cliff Hyde Flying <br />Service, Inc. regarding the issues, and has Hot applied the same <br />standards to others on the ~ield. I believe that "we have" now worked: <br />out the differences in our previous positions regarding the lease and <br />look forward to being presented with a new lease effecting the changes. <br />At that time, we expect" to finalize the matter such that we can both <br />begin the next phase required in our continued operation at the airport. <br /> <br />Should you have any questions or comment, please 00 not hesitate t9 <br />contact me at your earliest convenience~ <br /> <br />Sincerely, <br /> <br />~~ <br /> <br />Cliff Hyde <br />President <br />