My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1998-01-26 Workshop and Regular Meeting of City Council
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1998
>
1998-01-26 Workshop and Regular Meeting of City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:57:02 AM
Creation date
7/31/2025 10:51:06 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
1/26/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 0 <br />City of La Porte <br />Interoffice Memorandum <br />To: Mayor and City Council <br />From: Jeff Litchfield, Assistant City Manager <br />teve Gillett, Director of Public Works <br />Date: January 20, 1998 <br />Subject: Additional Water Capacity Purchase by the La Porte Area Water Authority <br />Background <br />The La Porte Area Water Authority (the "Authority") was created by an act of the Texas <br />Legislature to ensure an adequate supply of surface water for the Bayshore area, in response to <br />a mandate by the Hams -Galveston Coastal Subsidence District to convert to surface water. <br />The Act gives the City Council of the City of La Porte the power to name the members of the <br />Authority's board of directors, and final approval of contracts entered into by the Authority. <br />The Authority, after approval by the voters in 1982, began developing a plan to provide surface <br />water. After studying various alternatives, the Authority determined the most cost-effective <br />solution to be purchase of capacity at the City of Houston's Southeast Water Purification Plant, <br />then under design, and to construct transmission facilities to the Authority's customers. <br />The Authority negotiated contracts with the cities of La Porte, Shoreacres and Morgan's Point, <br />as well as the Bayshore Municipal Utility District, in November 1987. The contract with the City <br />of Houston to purchase capacity was finalized in December 1987. Funding in the amount of <br />$9.8 million was secured through the Texas Water Development Board to purchase the capacity <br />and design and construct transmission facilities. The Authority began taking treated surface <br />water from the Southeast Plant on March 20, 1991. <br />The Authority purchased 4.2 million gallons per day (mgd) of treated surface water, which was <br />split between the Authority's customers as follows: La Porte — 90.97% (including the former Bay <br />MUD), Morgan's Point — 4.29%, and Shoreacres — 4.47%. Currently, the cities of Shoreacres <br />and Morgan's Point are at or near their capacity, and the City of La Porte is at 88% of capacity. <br />The original study prepared by Espey, Huston & Associates projected the City of La Porte would <br />reach its capacity in 1999. However, projected populations did not increase at the rate <br />projected in the study. The population was expected to increase by 2.74% per year from 1986 <br />to 1990 and by 2.54% per year from 1990 to 1997 and the actual population increase was .77% <br />per year for 1986 to 1990 and 2.35% for 1990 to 1997. At the current population increase of <br />2.35% per year, the capacity will be reached in the year 2003. <br />Over the last several years, there has been discussion of the City of Houston expanding the <br />Southeast Plant or even re -engineering to provide more thru-put. However, at this time, the City <br />of Houston has no plans to proceed with either of these options. <br />
The URL can be used to link to this page
Your browser does not support the video tag.