Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />ARCHITECT for such Additional Services, which wilf be paid for by OWNER as indicated <br />in Sedion 5. <br /> <br />2.2.1 Services in connedion with work directive changes and change orders to reflect <br />changes requested by OWNER if the resulting change in compensation for Basic Services <br />is not commensurate with the addition services rendered. <br /> <br />2.2.2 Services in making revisions to Drawings and Specifications occasioned by the <br />OWNER's acceptance of substitutions proposed by Contrador(s); and services after the <br />award of each contrad in evaluation and determining the acceptability of an unreasonable <br />or excessive number of substitutions proposed by Contractor. <br /> <br />2.2.3 Services resulting from significant delays, changes or price inaeases occurring as <br />a dired or indired result of material, equipment or energy shortages. <br /> <br />2.2.4 Additional or extended services during construction made necessary by (1) work <br />damaged by fire or other cause during construdion, (2) a significant amount of defective or <br />neglected work of any Contrador, (3) acceleration of the progress schedule involving <br />services beyond normal working hours, and (4) default by any Contrador. <br /> <br />2.2.5 Services (other than Basic Services during the Operation Phase) in connection with <br />any partial utilization of any part of the Projed by OWNER prior to Substantial Completion. <br /> <br />2.2.6 Evaluating an unreasonable or extensive number of claims submitted by <br />Contrador( s) or others in connection with the work. <br /> <br />2-3 <br />