My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1999-05-17 Special Called Meeting and Workshop Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1999
>
1999-05-17 Special Called Meeting and Workshop Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:04:16 AM
Creation date
7/31/2025 10:53:24 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
5/17/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Memo <br />U John Joerns, Assistant City Manager <br />lidm: Doug Kneupper, Planning Directo <br />CC: <br />Date: 05/13/99 <br />Re: Cmdff Road Improvements <br />During budget presentations last summer, staff proposed using the existing 8 to 10 <br />inches of base material already in place and approach this project as a major <br />rehabilitation effort. The resulting roadway would be a 28' roadway with an asphalt <br />overlay. The cost of this approach was estimated to be $173,000. Staffs reasons <br />for this approach were that only portions of Pecan Crossing and Summer Winds <br />subdivisions would travel the road, the type of vehicles would be primarily passenger <br />vehicles and there would be few driveway cuts.. At that time, Council asked staff to <br />provide enough funds for a concrete road section. <br />The adopted Capital Improvement Budget includes $270,000 for the improvements <br />to Caniff Road. This project would result in the construction of a 28' wide concrete <br />road with concrete curbs. The curbs would have intermittent gaps to allow for <br />drainage into the roadside ditches. The existing limestone base material would be <br />salvaged and used elsewhere. <br />Prior to moving forward with this project we wish to confirm Council's direction on the <br />currently proposed cross-section which, as shown on the attachment, would result in <br />a concrete road with open ditches and gaps in the curb allowing drainage to the <br />ditches. To provide a lowered concrete road with underground storm sewer would <br />cost an additional $96,000 for a total estimated cost of $367,000. <br />3 <br />•PagDl <br />
The URL can be used to link to this page
Your browser does not support the video tag.