My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1999-07-26 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1999
>
1999-07-26 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:12 PM
Creation date
7/31/2025 10:53:52 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/26/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />1.5 Bidding or Negotiation Phase <br /> <br />After written authorization to proceed with the Bidding <br />or negotiation Phase, ARCHITECT shall: <br /> <br />1.5 .1 Following the OWNER's approval of the Construction Documents <br />and of the latest preliminary estimate of Construction Cost the <br />ARCHITECT shall assist OWNER in advertising for and obtaining bids <br />or negotiating proposals for the prime contract for construction, <br />materials, equipment and services; and, where applicable, maintain <br />a record of prospective bidders to whom Bidding Documents have been <br />issued, attend pre-bid conferences and receive and process deposits <br />for Bidding Documents. <br /> <br />1.5.2Issue addenda as appropriate to interpret, clarify or expand <br />the Bidding Documents. <br /> <br />1.5.3 Consult with and advise OWNER as to the acceptability of <br />subcontractors, suppliers and other persons and organizations <br />proposed by the prime contractor (herein called "Contractor") for <br />those portions of the work as to which such acceptability is <br />required by the Bidding Documents. <br /> <br />1.5.4Consult with OWNER concerning and determine the acceptability <br />of substitute materials and equipment proposed by Contractor when <br />substitution prior to the award of contracts is allowed by the <br />Bidding Documents. <br /> <br />1. 5. 5 Attend the bid opening, prepare bid tabulation sheets and <br />assist OWNER in evaluating bids or proposals and in assembling and <br />awarding the contract(s) for construction, materials, equipment and <br />services. <br /> <br />The duties and responsibilities of ARCHITECT during the <br />Bidding or Negotiation Phase are amended and supplemented as <br />indicated in paragraph 5 of Exhibit A "Further Description of Basic <br />Services and Related Matters". <br /> <br />1.6 Construction Phase <br /> <br />After written authorization to proceed with the <br />Construction Phase; ARCHITECT shall: <br /> <br />1.6.1General Administration of Construction Contract <br /> <br />ARCHITECT shall consult with and advise OWNER and act as <br />OWNER's representative as provided in the Standard General <br />Conditions of the Construction Contract (as approved by OWNER per <br />paragraph 1.4.4) . <br /> <br />The extent and limitations of the duties, responsibilities and <br />authority of ARCHITECT as assigned in said Standard General <br /> <br />1-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.