My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1999-11-08 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1999
>
1999-11-08 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:09:36 AM
Creation date
7/31/2025 10:54:18 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
11/8/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
® Preparing documents for alternate bids requested by the City or documents for out of <br />sequence work. <br />® Preparing to serve or serving as a consultant or witness for the City in any litigation, public <br />hearing or other legal or administrative proceeding involving the Project. <br />® Additional or extended services during construction made necessary by (1) work damaged <br />by fire or other cause during construction, (2) a significant amount of defective or neglected <br />work of Contractor(s), (3) prolongation of the construction contract time, (4) acceleration of <br />the progress schedule involving services beyond normal working hours and (5) default of <br />contractor <br />CMI will endeavor to apprise the City of any potential additional or extended services which <br />may result from the above listed 5 items, prior to CMI's expenditure of time on such services. <br />As previously noted, any such extended or additional services shall only be performed when <br />directed by the City to CMI. <br />O Additional services not otherwise provided for in the scope of services. <br />FEE <br />Survey Services <br />Claunch & Miller, Inc.'s fee for the field survey services is the lump sum amount of- <br />$7,700.00 <br />Geotechnical Services <br />Claunch & Miller, Inc.'s fee for the geotechnical services is the lump sum amount of: $1,320.00 <br />Preliminary Engineering Phase <br />Claunch & Miller, Inc.'s fee for the preliminary engineering phase is the lump sum amount of. <br />$7,200.00 <br />Final Design Phase <br />Claunch and Miller, Inc. will perform the Final Design Phase for the Lump Sum amount of- <br />$21,550.00 <br />Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.