Laserfiche WebLink
<br /> lREOUESAoR CI'fY COUNCIL AGEN.I ITEM <br /> Agenda Date Requested: December p, 1999 <br /> Requested By: Doug Kneupper ~ry Department, Planning <br /> XX Report esolution Ordinance <br /> Exhibits: Fairmont Parkway Overview <br /> - <br /> Summary & Recommendation <br /> - <br /> Harris County Precinct 2 is making progress and moving forward with the design of improvements to <br /> Fairmont Parkway (SH 146 to UPRR). The County and their engineer delivered a Preliminary <br /> Engineering Report for this project on October 13, 1999. <br /> Attached is an overview of that report. The full report analyzes numerous aspects of the road project <br /> including existing conditions, roadway design criteria, drainage criteria, future traffic analysis, <br /> construction phasing, environmental concems, and cost estimates. This overview focuses on items that <br /> directly affect the final design of the roadway. <br /> The recommended improvements, which staff concurs with, has a preliminary estimated cost of <br /> $3,224,861. Of this amount., the County is requesting the City's participation to be $269,074. City staff <br /> is currently woIking with the County to reduce the City's amount by approximately $50,000. <br /> These cost estimates do not include an amount for right-of-way acquisition. Pursuing this recommended <br /> design will require acquisition of 11 comer cutbacks along Fainnont Parkway and additional right-of- <br /> way along 16th Street., both north and south ofFairmont Parkway. <br /> The recommended improvements to Fairmont Parkway are described as follows: <br /> Construct Fairmont Parkway as a 6-1ane divided roadway with a combination raised median and <br /> median ditch. Construct 16th Street as a 4-lane roadway for approximately 800' both north and <br /> south of Fairmont Parkway. Make drainage improvements and continue to drain east into Little <br /> Cedar Bayou. Construct generous turning radii at all intersections to accommodate truck traffic. <br /> In addition to the 6-lane roadway, construct turning lanes at the following locations: <br /> 1. Eastbound Fairmont Parkway at 16th Street (left turn) <br /> 2. Eastbound Fainnont Parkway at 14'" Street (left turn) <br /> 3. Eastbound Fairmont Parkway at 13th Street (left turn Kroger Center) <br /> 4. Eastbound Fairmont Parkway at SH 146 (right turn) <br /> 5. Westbound Fairmont Parkway at 16'" Street (right turn) <br /> All recommendations contained within the Preliminary Engineering Report are based on Harris County <br /> criteria. The drainage systems will be designed using the 3-year design stonn. However, the drainage <br /> impact from a future overpass at UPRR was not considered. Staff feels it is very important that the <br /> drainage impact from a future overpass be analyzed at this time and considered with the Fainnont <br /> Parkway improvements. <br /> With Council's approval, the administration will write Precinct 2 and request they pursue the <br /> recommended improvements to Fairmont Parkway. The letter will also request that the County <br /> analyze drainage impacts from a future overpass, and that the County consider reducing the City's <br /> level of estimated participation by approximately $50,000. <br /> Approved for City Council Agenda - - <br /> .Gtt 1l~ I ~-~ ''1'1 <br /> Robert T. Herrera Date <br /> City Manager <br />