<br /> e e <br /> additional storm water runoff from this project, it was determined that no <br /> significant impact would be made to Little Cedar Bayou based on a 1 DO-year <br /> storm. <br /> RIECOM MENIOA 1rIONS <br /> Right-of-Way - No right-of-way acquisition will be required along Fairmont <br /> Parkway. However, several corner cutbacks are recommended to facilitate <br /> construction of generous turning radii to accommodate truck traffic. The <br /> cutbacks include all four corners of 16th Street, all four corners of 14th Street, the <br /> southwest corner of 13th Street, and the two corners on the west side of SH 146. <br /> Along 16th Street, additional right-of-way will be required within the first three <br /> blocks, both north and south, along the east side of the road. The additional <br /> right-of-way is neaded to construct the four-lane divided road section at the <br /> intersection which then transitions back to the existing two-lane roadway <br /> approximately 800' both north and south of Fairmont Parkway. <br /> Pan,ing - The pavement design for Fairmont Parkway will be six-lane divided <br /> concrete with curb and gutter (3 lanes in each direction). There will also be five <br /> turning lanes at the following locations: <br /> 1. Eastbound Fairmont Parkway at 16th Street (left turn) <br /> 2. Eastbound Fairmont Parkway at 14th Street (left turn) <br /> 3. Eastbound Fairmont Parkway at 13th Street (left turn Kroger Center) <br /> 4. Eastbound Fairmont Parkway at SH 146 (right turn) <br /> 5. Westbound Fairmont Parkway at 16th Street (right turn) <br /> Please note that the existing mandatory left turn lane median opening <br /> at 1 t" Street, leading into the Kroger Center, will be eliminated. An <br /> item of particular interest is that the engineer that prepared the Traffic <br /> Impact Analysis observed a significantly higher number of vehicles <br /> using the 1 j" Street entrance instead of the 1 i" Street entrance. <br /> The six-lane roadway will transition back to the existing four-lane roadway <br /> approximately 500' west of 16th Street. <br /> 16th Street will be a four-lane concrete road with open ditch drainage. This <br /> design will extend for approximately 800' both north and south of Fairmont <br /> Parkway before 16th Street transitions back to the existing two-lane roadway. <br /> Drainage - Reinforced concrete pipe and concrete box culverts will be used for <br /> this project. The pipe sizes will range from 18" to 60" and the boxes will range <br /> from 6'x3' to 8'x4'. The Fairmont Parkway median ditch from 14th Street to the <br /> UPRR tracks will be used for storm water detention. The existing 54" storm <br /> sewer along the south side of Fairmont parkway, between SH 146 and 14th <br /> Page 3 of 5 <br />