My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1999-12-13 Regular Meeting, Workshop Meeting, and Public Hearing
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1999
>
1999-12-13 Regular Meeting, Workshop Meeting, and Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:13 PM
Creation date
7/31/2025 10:54:21 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
12/13/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> e e <br /> PRELIMINARY ESTIMA TIED CONSTRUCTION COSTS <br /> A preliminary construction cost estimate for the project, including a 20% <br /> contingency is approximately $3,224,861. This preliminary cost estimate does <br /> not include any utility relocation costs or right-of-way acquisition costs. Of the <br /> total estimated amount, $269,074 has been calculated to be the City's level of <br /> participation in conjunction with, 1) the third additional lane eastbound and <br /> westbound, 2) the right turn lane eastbound at SH 146, and 3) the upgrade from <br /> span-wire to mast-arms for the signal at 16th Street. It is staff's opinion that items <br /> 2 and 3 should be included as part of the County's participation for this project <br /> and we will work toward that with County staff. Item 2 is estimated to cost <br /> $20,000 and item 3 is estimated to cost 32,000. Final participation by the City <br /> will be formalized and identified within the Interlocal Agreement which is being <br /> drafted by the County. <br /> Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.