Laserfiche WebLink
® • <br />Street Ends Report, page 4 <br />Recommendation <br />• Develop six sites over a period of 5 to 6 years. <br />• obtain a legal opinion regarding the legality of using rights of way as parks <br />(completed) <br />• Obtain permits from U.S. Army Corps of Engineers and Texas General Land <br />Office for shoreline modification. <br />• Develop the street ends as parks, according to a fairly standardized plan, <br />discussed below. <br />• Start with the Bayshore @ F Street (Pine Bluff) Right of Way first (Number 11 <br />on the list). <br />The Street Ends to be developed are shown below as they currently appear: <br />1. Lobit Street, shown below <br />