My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2000 01-17 Special Called Workshop Meeting
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2000
>
2000 01-17 Special Called Workshop Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:13 PM
Creation date
7/31/2025 10:54:27 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
1/17/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Street Ends Report, page 8 <br />C. Estimated Cost to Implement <br />Staff has reviewed the sites and had preliminary discussions with the Pine Bluff <br />community regarding the Bayshore @ F Street site (#11 above). Staff met with a <br />group of citizens on two occasions in October and November 1999 to discuss the <br />issue and receive their input regarding the potential for a park at this location. Staff <br />developed a cost estimate based on the above standard as follows: <br />Parking Spaces 2 @ +/- $1,200 ea. $2,400.00 <br />Shoreline Modification +/- 5,000.00 <br />10' Wooden Deck at shoreline 32 I.f. @ $ 15 per I.f. 480.00 <br />4' Sidewalk 40 I.f. @ $ 8 per I.f. 320.00 <br />Wooden decorative fence 50 I.f. @ $10 per I.f. 500.00 <br />Decorative Archway 250.00 <br />Park Benches 3 @ $175 ea. 525.00 <br />Waterline, Drinking Fountain and Hose Bib 400.00 <br />Either 16' Park Gazebo 9,000.00 <br />®r Picnic Shelter (like Seabreeze) 5,000.00 <br />Picnic Table 530.00 <br />Trash Receptacles 2 @ $175 ea. 350.00 <br />3" Caliper Tree, planted 45.00 <br />Shrubs, planted + bed prep. 8 @ $10 ea. 80.00 <br />Fountain Grass 16 @ $2.25 ea. 36.00 <br />Contingency 2,500.00 <br />''*Total, with Gazebo and no Picnic Shelter $22,416.00 <br />*Total, with Picnic Shelter and no Gaze bo $18,416.00 <br />Staff discussed the possibility of neighborhood involvement and a possible joint venture <br />arrangement for development with the community group. They were interested in informal <br />assistance for the project, for example litter pickup or other assistance, but were hesitant <br />to commit to a formal arrangement that would require a financial commitment on their part <br />to develop the site. If the project is approved, the community representatives suggested <br />Pine Bluff Park as a suitable name for the new park. <br />* These are estimated costs based on prior purchases or staff research; most costs are contracted <br />costs, some are force account (i.e. landscape, and waterline). Shoreline modification is based on $125 per <br />linear foot, which may be somewhat steep for riprap modification, but there may be some work required to <br />match with neighboring properties. Bulkheading will be much more expensive (+/- $250 per linear ft.). <br />
The URL can be used to link to this page
Your browser does not support the video tag.