My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2000-01-10 Regular Meeting and Public Hearing
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2000
>
2000-01-10 Regular Meeting and Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:56:59 AM
Creation date
7/31/2025 10:54:29 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
1/10/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />AGENDA UEM <br />Agenda Date Requested: January 10, 2000 <br />Requested By: Doug Kneuppe Department: Planning <br />Report Res tion X Ordinance <br />Exhibits: <br />Ordinance <br />Bid Tabulation <br />Bidder's List <br />Summary & Recommendation <br />As part of the FY 99-00 Budget for Capital Improvement Projects, City Council approved <br />$50,000 for the City -Wide Sidewalk Replacement Project. This project consists of the <br />replacement of existing sidewalks in different subdivisions throughout the city. <br />Survey, design and engineering were performed on this project utilizing city staff. On <br />December 21, 1999, the City received competitive bids from three qualified contractors (see <br />attached Bid Tabulation). The low bid was submitted by Bluebonnet Stroder Company of <br />South Houston, Texas, in the amount of $45,196. The contract will be complete within 120 <br />consecutive calendar days once the "Notice to Proceed" is issued. <br />Staff has reviewed the submitted bids and determined the low bid from Bluebonnet Stroder <br />Company is within the budgeted amount and Bluebonnet Stroder Company is qualified to <br />perform this work. Staff recommends that the City Council authorize the City Manager to <br />execute a contract with Bluebonnet Stroder Company in the amount of $45,196, plus a <br />contingency of $4,520 for construction of the City -Wide Sidewalk Replacement Project FY <br />99-00. <br />Action Required by C„ ouncil: <br />Consider approving an ordinance authorizing the City Manager to execute a contract with <br />Bluebonnet Stroder Company in the amount of $45,196, plus a contingency of $4,520 for <br />construction of the City -Wide Sidewalk Replacement Project FY 99-00. <br />Availability of Funds: <br />General Fund Water/Wastewater <br />X Capital Improvement General Revenue Sharing <br />Other <br />Account Number: 015-9892-709-1100 Funds Available: X Yes No <br />Approved for City Council Agenda <br />1 _ 1 - S-oD <br />Robert T. Herrera Date <br />City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.