Laserfiche WebLink
J <br />• <br />Explosion: No Overfilling: No Tornado: Yes <br />Runaway reaction: No Contamination: No Hurricanes: Yes <br />Polymerization: No Equipment failure: Yes Other (Specify): <br />Loss of cooling, heating, <br />electricity, instrument air: No <br />d. Process controls to use: <br />Vents: Yes Emergency air supply: Yes Other (Specify): <br />Relief valves: Yes Emergency power: No <br />Check valves: No Backup pump: No <br />Scrubbers: No Grounding equipment: No <br />Flares: No Inhibitor addition: No <br />Manual shutoffs: Yes Rupture disks: No <br />Automatic shutoffs: No Excess flow device: No <br />Interlocks: No Quench system: No <br />Alarms and procedures: Yes Purge system: No <br />Keyed bypass: No None: No <br />e. Mitigation systems in use: <br />Sprinkler system: No Water curtain: No <br />Dikes: No Enclosure: No <br />Fire walls: No Neutralization: No <br />Blast walls: No None: Yes <br />Deluge system: No Other (Specify): <br />f. Monitoringldetection systems in use: <br />Process area detectors: Yes None: No <br />Perimeter monitors: No Other (specify): <br />g. Changes since last PHA or PHA update: <br />Reduction in chemical inventory: No Installation of perimeter monitoring systems: <br />No <br />Increase In chemical inventory: No Installation of mitigation systems: <br />No <br />Change process parameters: No None recommended: <br />No <br />Installation of process controls: No None: <br />Yes <br />Installation of process detection systems: No Other (Specify): <br />8.5 The date of the most recent review or revision of operating procedures: <br />06/09/1999 <br />8.6 Training: <br />a. The date of the most recent review or revision of training programs: <br />06/09/1999 <br />01 /181= 3:25:11 PM <br />Page 6 of 8 <br />