My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2000-02-21 Special Called Regular Meeting and Workshop Meeting
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2000
>
2000-02-21 Special Called Regular Meeting and Workshop Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:03:32 AM
Creation date
7/31/2025 10:54:39 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
2/21/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.7 "Distribution Allocation" means that portion of the Distribution Capacity in the <br />Treated Water Transmission Facilities measured in MGD which a Participant is allowed to take in <br />an hourly period. <br />1.8 "Distribution Capacity" means the maximum rate at which the Treated Water <br />Transmission Facilities can deliver. The Distribution Capacity equals 250 MGD, expressed as peak <br />hour transmission rate. <br />1.9 "Distribution Allocation Factor" is the percentage of the Treated Water Transmission <br />Facilities, which a Participant is entitled to taking during an hourly period. <br />1.10 "Fiscal Year" means the Managing Participant's fiscal year, which currently runs from <br />July 1 to June 30. <br />1.11 "Interest Rate" means the 20 City Municipal Bond Index at the beginning of the Fiscal <br />Year. <br />1.12 "Major Replacement" means any single repair or replacement for the Plant requiring <br />the expenditure of $100,000 or more. <br />1.13 "Managing Participant Director" means the Director of Managing Participant's <br />Department of Public Works and Engineering. <br />1.14 "MGD" is an abbreviation for the flow rate of a million gallons of water per day. <br />1.15 "Modification Project Cost" includes: <br />.1 Cost for facilities to increase the reliable capacity of the Plant to 120 MGD, <br />including engineering, testing, construction, construction management, legal, <br />AAEWB 10975.RV I <br />L.D. File No. M99146.01 <br />3 <br />February 9. 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.