My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2000-02-21 Special Called Regular Meeting and Workshop Meeting
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2000
>
2000-02-21 Special Called Regular Meeting and Workshop Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:03:32 AM
Creation date
7/31/2025 10:54:39 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
2/21/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
determined at the Interest Rate to the Managing Participant within ninety (90) days of the date of the <br />receipt of the accounting by the Participants. <br />2.4.7 If a Participant does not pay its underpayment within such ninety (90) day period, the <br />Participant's Demand Allocation Factor shall be reduced to reflect the actual percentage of <br />Modification Project Cost paid by the Participant. <br />2.5.1 When the Managing Participant Director gives the construction contractor notice of <br />Substantial Completion for the Modification Project, the Managing Participant shall notify each <br />Participant Director and designate a day for the initial operation of Plant at 120 MGD firm capacity. <br />2.5.2 The Managing Participant shall provide each Participant full access to the Plant and <br />to the books and records of the Modification Project, including all engineering reports, design <br />specifications, change orders, correspondence, plant accounts, construction plan accounts or any <br />other written document or instrument associated with or pertaining to the construction of the <br />Modification Project. <br />2.6 Additional Pumping and Distribution Allocations <br />Certain Participants are requesting additional Pumping and Distribution Allocations as shown <br />in the Participant Exhibits. The Pumping and Distribution Allocation Factors for these Participants <br />will be adjusted upon payment to the Managing Participant of the respective amounts shown in the <br />Participant Exhibits. <br />A:\EWB10975.RVI <br />L.D. File No. 80-99146-01 <br />February 9. 2000 <br />13 �_ .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.