k <br />3.6.3 Flow measurement for the Managing Participant will be generally calculated by <br />subtracting the total flow to the other Participants from the total production of the Plant. The <br />Managing Participant agrees to operate its water transmission system such that the water it takes <br />(measured as provided herein) is within its Demand, Pumping, and Distribution Allocations by <br />restricting flow through valves or reallocating water flow from its East Water Purification Plant. <br />3.6.4 In the event another Participant cannot obtain water from the Plant at the pressure <br />required herein (as measured upstream of the Participant's meter), such Participant may deliver <br />notice to the Managing Participant, who. shall provide it best efforts to increase pressure to the Point <br />of Delivery by increasing the production of the Plant or diverting water from the East Water <br />Purification Plant, restricting the internal valves in its own system, removing a force majeure or <br />other hindrance that may be causing the low pressure, and restricting Participants that may be taking <br />more water than allowed under this Agreement as provided in Subsection 3.6.1. The Managing <br />Participant may also restrict flow as necessary in emergency situations (fires, major leaks, etc.) or <br />when the purchased distribution capacity is exceeded by actual flows. <br />3.6.5 Once the hydraulics of the Plant and water distribution system are better known and <br />subject to the acquisition of any necessary flow monitoring and control facilities, all members of the <br />Operating Advisory Committee by unanimous vote may adopt procedures that will allow unused <br />Demand, Pumping and/or Distribution Capacity to be used in common by the Participants on a <br />temporary basis. (Permanent redistribution of capacity is subject to the assignment requirements of <br />Section 5.8) <br />A:1E WB 10975.RV I <br />L.D. File No. 80-99146-01 <br />411 <br />February 9. 2000 <br />